Site Power HV/LV Electrical Design
key details
| Value | £100,000 |
|---|---|
| Status | active |
| Category (CPV) | 71323100 +4 more |
| Region | East of England |
| Deadline | 18 Aug 2026 |
| Contract start | 20 Nov 2026 |
| Contract end | 12 Feb 2027 |
| SME suitable | Yes |
| OCID | ocds-b5fd17-5642bf1a-b723-42dc-8746-99883c580954 |
description
The HV/ LV electrical design is essential to develop a robust and safe electrical distribution network within the Tunnel Launch Compound (TLC), the STP, SXB, SMT areas within the Temporary Construction Area (TCA) and the Ancillary Construction Area (ACA) to support tunnel construction at the SZC site. The network will be required to distribute power to the following areas and equipment:
Underground:
Tunnel boring machines (TBMs), Slurry pump system
Underground Conveyor belt system Ventilation system
Lighting & Communication networks Ancillary tunnel construction equipment
Overground:
Ventilation system
Cooling water system
Overground conveyor belt system Overground slurry pump system Compressed air system Grout batching plant
Dewatering system & water treatment plant Gantry cranes
Site lighting, access control & communication systems Office building/ welfare Ancillary site activities
Electrical loading details of the equipment listed above will be collated and provided by CWA to the selected electrical design engineers. The design will be required to comply with current British Electrical safety legislation.
Key Deliverables:
HV network design -
Provide the design for the distribution of the 11kV network that feeds the TLC, TCA & ACA compounds complete with associated switchgear, cable sizing, cable routes and containment systems. Provide protection settings of circuit protective devices for safe disconnection of the supply under fault conditions. Stage 4 drawings complete with associated schematics to be provided of proposed cable routes, ducting sizing/ routes, substation locations. The design will need to be agreed with the CWA/ Sizewell site team to ensure power demands and circuit configurations are compatible with the wider HV network on site.
Substation design -
The design and specification of the substations complete with earthing design to distribute and transform where necessary the main 11kV supply that will be used to supply the above listed compounds. Where LV (690v/400v) supplies are required, suitably sized transformers to be specified to provide sufficient power for the supplied equipment. Stage 4 drawings complete with associated schematics to be provided of substations.
LV Network -
Provide the design for the distribution of LV network to supply required equipment/ plant with associated switchgear, cable sizing, cable routes and containment systems to required areas of distribution. Provide protection settings of circuit protective devices for safe disconnection of the supply under fault conditions. Stage 4 drawings complete with associated schematics to be provided of proposed cable routes, substation/feeder pillar locations, MDU sub main distribution locations.
Site Lighting -
Provide site lighting design to provide adequate lighting for site activities. Stage 4 drawings complete with associated schematics to be provided of lighting locations and specifications.
documents
- https://www.competefor.co.uk/business/viewOpportunityDetailsSupplier.html?id=117177066 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/8b23e699-4fcd-43eb-b901-a40d77868aeb , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 10 Aug 2026 | Tender (tender) | · | 8b23e699-4fcd-43eb-b901-a40d77868aeb-910065 |
more from Sizewell C Limited
- Tunnel Segment Production Monitoring System copy · £500,000 · 17 Aug 2026
- Tunnel Segment Production Monitoring System · £500,000 · 6 Aug 2026
- Fire and Rescue Services · £20,000,000 · 29 Apr 2026
- Instrumentation and Monitoring · £40,000,000 · 29 Apr 2026
- Sizewell C - HR Monitoring (CRX & Building) Package · £5,000,000 · 27 Mar 2026
- Sizewell C (CWA) - Reinforcement Cut & Bend Plant, Equipment and Machinery · £20,000,000 · 6 Nov 2025
- SZC - Main Works Earthworks - Bulk Excavation · £250,000,000 · 17 Oct 2025
- EOI template for users - Template copy - Template copy - Template copy - Template copy - Template copy · £250,000 · 19 Sept 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Substation 9 LV Panel & Generator Replacement and Evelina Standby Power · Guy's and St Thomas' NHS Foundation Trust · £3,978,198
- CO Construction ECI GIS Substation Works – LT490/491/436 Stannergate Substation - 1126 · SSE plc
- CW - LV4 Sub Station Design ETA Projects · Chelsea and Westminster Hospital NHS Foundation Trust
- PCI_LotA_174 Energy Infrastructure and opportunities analysis · HAMPSHIRE COUNTY COUNCIL · £35,000
- Combined Heat and Power Unit (Falmer Sports Centre) Energy Performance Contract - AWARD · University of Brighton · £470,000
- DHC DH1320 Bridport Hospital Replacement Electrical Panel Board Design Services · Dorset HealthCare University NHS Foundation Trust · £19,090
- D1403 Replacement Standby Generator · Nuclear Restoration Services Limited (Dounreay) · £139,981
- Solar Panel Installation Design Work · Derbyshire Support & Facilities Services · £5,800
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.