Sizewell C - HR Monitoring (CRX & Building) Package
key details
| Value | £5,000,000 |
|---|---|
| Status | active |
| Category (CPV) | 71311000 +21 more |
| Deadline | 10 Apr 2026 |
| Contract start | 30 Oct 2028 |
| Contract end | 4 Mar 2030 |
| SME suitable | Yes |
| OCID | ocds-b5fd17-fef0fc6a-e18e-4e8d-a410-788d1080f1f6 |
description
Overview of Scope
Supply and installation of the HR Monitoring System to the to CRX and Nuclear Island Building
The EAU (containment monitoring) system is required to continuously monitor and assess the mechanical behaviour and integrity of the Reactor Building and integrity of the Reactor Building and associated at nuclear island at Sizewell C (SZC) throughout construction, testing, and operation. The system scope covers the design, supply, installation, commissioning, and documentation of:
| • | Monitoring sensors (including extensometers, temperature probes, hydraulic levelling pots, pendulums, invar wires, inclinometers, hygrometers, and pressure sensors) |
| • | Associated cabling, connection/grouping boxes, and acquisition/data logger cabinets |
| • | All necessary software interfaces and data collection/reporting tools |
More than 200 sensors will be embedded and installed in both the inner containment wall and the common raft of the nuclear island.
The EAU monitoring system must provide real-time and periodic data on:
| • | Settlements and deformations of the nuclear island raft (topographical markers, hydraulic levelling pots, extensometers, and temperature sensors) |
| • | Overall containment distortions (pendulums and invar wires) |
| • | Localized deformations and tendon failure detection (embedded extensometers, local monitoring devices) |
| • | Tension in prestressed cables (dynamometers) |
| • | Environmental parameters (temperature, humidity, internal and external pressure) |
All EAU system components must comply with the Book of Technical Specifications (BTS) Chapter 9.04 and associated referenced as well as client installation and interface requirements. Instruments must be delivered with calibration certificates and installed in accordance with manufacturer and project-specific procedures.
The EAU system contractor will also provide:
| • | Installation studies and execution drawings for all phases (temporary/erection and permanent/operational) |
| • | Material Approval Forms, Inspection and Test Plans, Quality Release Certificates, and Lifetime Quality Records (LTQR) |
| • | Data collection, reporting formats, and periodic analysis files as required by the client (monthly/bi-monthly during construction; weekly/daily during key phases; and as specified during operation) |
Additional information: It will be beneficial for you to describe your business as much as possible and highlight where you can help us to achieve our values described above
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=108307235 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/5ec0fb87-1fe6-492f-9a9a-20cfb71fb2dc , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 27 Mar 2026 | Tender (tender) | · | 5ec0fb87-1fe6-492f-9a9a-20cfb71fb2dc-890326 |
more from Sizewell C Limited
- Tunnel Segment Production Monitoring System copy · £500,000 · 17 Aug 2026
- Site Power HV/LV Electrical Design · £100,000 · 10 Aug 2026
- Tunnel Segment Production Monitoring System · £500,000 · 6 Aug 2026
- Fire and Rescue Services · £20,000,000 · 29 Apr 2026
- Instrumentation and Monitoring · £40,000,000 · 29 Apr 2026
- Sizewell C (CWA) - Reinforcement Cut & Bend Plant, Equipment and Machinery · £20,000,000 · 6 Nov 2025
- SZC - Main Works Earthworks - Bulk Excavation · £250,000,000 · 17 Oct 2025
- EOI template for users - Template copy - Template copy - Template copy - Template copy - Template copy · £250,000 · 19 Sept 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Stanground 2025 · Environment Agency · £52,235
- Winter Maintenance Operational Review · Dudley Metropolitan Borough Council · £47,266
- Station Water Management Design · Strathclyde Partnership for Transport · £96,239
- STON001 - Stony Stratford Sluice Platform and Stilling Well · Environment Agency · £95,483
- Ardrossan Redevelopment Civils Design · Caledonian Maritime Assets Ltd (Utility)
- Contract Award Notice - Penton Hook Maintenance work Lot 3 · Department for Environment, Food & Rural Affairs · £90,000
- Contract Award Notice - THMS - Incident Response for Vegetation Maintenance · Environment Agency · £160,000
- BSIP Civil Engineering Project Manager for Bus Stop Infrastructure. · Worcestershire County Council · £68,815
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.