gvtcx

Tunnel Segment Production Monitoring System

Sizewell C Limited Published 6 Aug 2026 Contracts Finder

key details

Value£500,000
Statusactive
Category (CPV) 45221247
RegionLondon, South West, South East
Deadline14 Aug 2026
Contract start3 Mar 2027
Contract end3 Dec 2034
SME suitableNo
OCIDocds-b5fd17-237252c3-1022-40b9-903c-50d898896667

description

This project involves the manufacturing, transportation and installation of approximately 39000 precast concrete tunnel segments. The segments will be produced at Avonmouth tunnel precast factory, transported through a multi-modal logistics network (truck and train interfaces), stored across 4 facilities (TPF, Railhead, ACA and TLC), ultimately installed within three TBMs serving two intake tunnels and one outfall tunnel configuration.

This operation requires complete end-to-end visibility from the moment a segment is cast until it is installed within the tunnel structure. Currently, critical gaps exist in reporting, quality traceability, inventory discrepancies, and segment tracking across the supply chain. A comprehensive traceability system is essential to manage the entire lifecycle, prevent installation errors, ensure quality compliance, eliminate segment duplication, and maintain supply chain transparency across all stakeholders.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

2 notices published against this procurement.

PublishedTypeRegimeNotice
6 Aug 2026 Tender (tender) · 2375427c-6174-48ea-9bb1-6dca14761f9f-909713
12 Aug 2026 Tender (tender) · 37f4cf48-bafe-44cc-8c14-f89d74cc0bd8-910415

more from Sizewell C Limited

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.