Tunnel Segment Production Monitoring System copy
key details
| Value | £500,000 |
|---|---|
| Status | active |
| Category (CPV) | 45221247 |
| Region | London, South West, South East |
| Deadline | 21 Aug 2026 |
| Contract start | 3 Mar 2027 |
| Contract end | 3 Dec 2034 |
| SME suitable | No |
| OCID | ocds-b5fd17-e86010e9-31cb-4390-97d2-24719474ed92 |
description
This project involves the manufacturing, transportation and installation of approximately 39000 precast concrete tunnel segments. The segments will be produced at Avonmouth tunnel precast factory, transported through a multi-modal logistics network (truck and train interfaces), stored across 4 facilities (TPF, Railhead, ACA and TLC), ultimately installed within three TBMs serving two intake tunnels and one outfall tunnel configuration.
This operation requires complete end-to-end visibility from the moment a segment is cast until it is installed within the tunnel structure. Currently, critical gaps exist in reporting, quality traceability, inventory discrepancies, and segment tracking across the supply chain. A comprehensive traceability system is essential to manage the entire lifecycle, prevent installation errors, ensure quality compliance, eliminate segment duplication, and maintain supply chain transparency across all stakeholders.
documents
- https://www.competefor.co.uk/business/viewOpportunityDetailsSupplier.html?id=117808137 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/8487f9cc-06bc-476d-9212-9dfd09693e47 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 17 Aug 2026 | Tender (tender) | · | 8487f9cc-06bc-476d-9212-9dfd09693e47-911042 |
more from Sizewell C Limited
- Site Power HV/LV Electrical Design · £100,000 · 10 Aug 2026
- Tunnel Segment Production Monitoring System · £500,000 · 6 Aug 2026
- Fire and Rescue Services · £20,000,000 · 29 Apr 2026
- Instrumentation and Monitoring · £40,000,000 · 29 Apr 2026
- Sizewell C - HR Monitoring (CRX & Building) Package · £5,000,000 · 27 Mar 2026
- Sizewell C (CWA) - Reinforcement Cut & Bend Plant, Equipment and Machinery · £20,000,000 · 6 Nov 2025
- SZC - Main Works Earthworks - Bulk Excavation · £250,000,000 · 17 Oct 2025
- EOI template for users - Template copy - Template copy - Template copy - Template copy - Template copy · £250,000 · 19 Sept 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Maen Porth Tunnel Falmouth - Tunnel Wetworks · Corserv Limited · £25,000
- HS2 Main Works S1 & S2 - WP171 SCL Formwork · Skanska Costain STRABAG Joint Venture (SCS JV) · £5,000,000
- Early Works for the Lower Thames Crossing - North Portal and Tunnelling Spoil Disposal Services · Highways England · £571,583
- Early Works for the Lower Thames Crossing - North Portal and Tunnelling Spoil Disposal · Highways England
- Lower Thames Crossing - Tunnelling and associated works activities (Spoil Disposal from North Portal) · Highways England
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.