installation of Solar PV, battery Storage and EV Charging at the RAF club, Merthyr
key details
| Category (CPV) | 09300000 +8 more |
|---|---|
| Deadline | 27 Jul 2022 |
| Procedure | open |
| OCID | ocds-kuma6s-123223 |
description
ScopeDesign and Install a Grid Tied 45.0 kWp Photovoltaic Array, AC Coupled 8.2kWh battery Storage and EV Charging Stations at the RAF Club, Merthyr Tydfil. The PV Inverter and Battery Storage to be in the electrical switch room.PV System Design.The PV system will incorporate the following points within the design.• Inverter must have minimum 10-year warranty• Type 2 surge protection built into the inverter.• Tier 1 Modules with a Module Efficiency greater than 20%• Modules to have a 12 Year Warranty for Materials and Processing.• Modules to have 25-year Power output Warranty (Power Output Tolerance - ≤2% Year 1 & ≤0.55% years 2 to 25)• For ease of maintenance, module level monitoring is to be included with connection to internet.• By isolating the AC supply the DC circuit must reduce below DC touch safe level• Inverter selection must have built in arc fault detection.• In Roof mounting system.• G99 Application for connection.• MCS registration.Battery System DesignThe Battery Storage system will incorporate the following points within the design.• AC coupled system.• Battery to be Floor or Wall Mounted.• Battery Construction – LiFePO4• 10 Year Product Warranty.EV Charge PointThe Electric Vehicle Charge point will incorporate the following in the design.• 2 x Twin 22kW Type 2 Mode 3Charge Point Pedestals.• Built in PEN Fault Detection (No Earth Rod Requirements)• Smart Charge Point Regulations 2021 Compliant.• Smart Charge Point Regulations 2021 Compliant.• OZEV approved.• Warranty – Minimum 3 yearsElectrical InfrastructureConnection to the existing electrical System will be via appropriately sized AC isolators located within the switch room. AC radial supply circuits to isolators will be tested and certified by the onsite electrician.AccessAccess to be supplied by Main Contractor. The scaffold will have edge protection to all areas of the roof where proposed PV array is to be installed. Scaffold to have all safety permits and certificates in place before access to work granted.A site visit is recommended to confirm design requirements prior to pricing.NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=123223.
N/A(WA Ref:123223)Under the terms of this contract the successful supplier(s) will be required to deliver Community Benefits in support of the authority’s economic and social objectives. Accordingly, contract performance conditions may relate in particular to social and environmental considerations. The Community Benefits included in this contract are:The promotion of local renewable energy generationRelates to the following project/programme financed by EU Community Funds: AMMV energy work EU funded project
more from H Factor
- Renewable Energy Installations for HFactor Developments · 13 Sept 2023
- HFactor Renewable Maintenance Contract · 12 Jun 2023
- Renewables at Tiffins Cafe Merthyr · 12 Jun 2023
- HFACTOR Marketing Program · 23 May 2023
- Swallow tree gardens renewable proposal · 20 Mar 2023
- Installation of Renewables at the Roadside Cafe · 7 Mar 2023
- Monitoring and evaluation of HFactor AMV Energy Worx Project · 7 Mar 2023
- installation of Solar PV, Battery storage and EV charging at domestic dwelling in Bridgend · 19 Jul 2022
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Heating Metering, Billing Installation & Service · The Mayor and Commonalty and Citizens of the City of London · £1,013,415
- PfH - Responsive Repairs, Disrepair Works and Void Services · Procurement for Housing · £725,000,000
- Supply of Metered Electricity · NORTHERN IRELAND WATER LIMITED · £534,000,000
- Provision of Air Source Heat Pump Systems and Solar Photovoltaic Arrays for Four Children and Family Hubs in Leicestershire · Leicestershire County Council · £98,507
- Utility provider Electricity · mhs homes group · £955,868
- Heating Replacement Works - Phase 2 · SHARE MULTI ACADEMY TRUST
- Installation of Air Source Heat Pump System at Fleetdown Community Centre, Dartford · Dartford Borough Council
- The Flexible Procurement and Supply of Half Hourly Electricity · ASSOCIATED BRITISH PORTS · £185,000,000
source
Published on Sell2Wales. Contact details for named individuals are not reproduced on this site.