installation of Solar PV, Battery storage and EV charging at domestic dwelling in Bridgend
key details
| Category (CPV) | 09330000 +5 more |
|---|---|
| Deadline | 27 Jul 2022 |
| Procedure | open |
| OCID | ocds-kuma6s-123226 |
description
ScopeDesign and Install a Grid Tied 11.0 kWp Photovoltaic Array, 10kWh Battery Storage and 7.2 kW EV Charge Point for Mr. Julian Allen, Fox Hollows, Heol Spencer, Coity, Bridgend, Mid Glamorgan, CF35 6AT. The PV Inverter and Battery to be located within attached garage area. The new EV charge point will be located to side of the attached garage..PV System Design.The PV system will incorporate the following points within the design.• Inverter must have minimum 12-year warranty• Type 2 surge protection built into the inverter.• Tier 1 Monocrystalline Modules with a Module Efficiency greater than 20%• Modules to have a 12 Year Warranty for Materials and Processing.• Modules to have 25-year Power output Warranty (Power Output Tolerance - ≤2% Year 1 & ≤0.55% years 2 to 25)• Safe Touch voltage technology built into the design to reduce DC voltage at loss of inverter power.• Optimisation to mitigate all types of module mismatch-loss from manufacturing tolerance to partial shading.• Optimisation to ensure maximum generation of the PV modules at panel level, minimum one for two panels.• Inverters and optimisers be manufactured from the same company• Modbus meter with CT’s at intake position to monitor Import / Export via online monitoring system.• For ease of maintenance, module level monitoring is to be included with connection to internet• By isolating the AC supply the DC circuit must reduce below DC touch safe level• Inverter selection must have built in arc fault detection according to UL1699B• Arc fault detection must reduce DC current and DC voltage.• In Roof mounting system.• G99 Application for connection.• MCS registration.Battery System DesignThe Battery Storage system will incorporate the following points within the design.• DC coupled to PV system.• Battery to be Floor or Wall Mounted.• Expandable up to 30kWh• 10 Year Product Warranty.• 5kW AC Discharge power.EV Charge PointThe Electric Vehicle Charge point will incorporate the following in the design.• 1 x Single 7kW Type 2 Mode 3Charge Point.• 3 Charging Modes: ECO, ECO+ & FAST• Optimises Microgeneration Self-Consumption• Works with Solar PV• PIN Code lock Function.• Curtilage Power Management Function• Built in PEN Fault Detection (No Earth Rod Requirements)• Smart Charge Point Regulations 2021 Compliant.• Smart Charge Point Regulations 2021 Compliant.• OZEV approved.• Warranty – Minimum 3 yearsElectrical InfrastructureA new 4-way 100A Single Phase Consumer Unit will be required for the New Inverter, Charge Point and meter. The existing consumer unit has no spare capacity available. New consumer unit to be connected via 100A connection blocks via incoming supply tails.AccessAccess to be supplied via scaffold with edge protection to all areas of the roof where proposed PV array is to be installed. Scaffold to have all safety permits and certificates in place before access to work granted.A site visit to site is recommended to confirm design requirements prior to pricing.NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=123226.
N/A(WA Ref:123226)Under the terms of this contract the successful supplier(s) will be required to deliver Community Benefits in support of the authority’s economic and social objectives. Accordingly, contract performance conditions may relate in particular to social and environmental considerations. The Community Benefits included in this contract are:Local generation of renewable energyRelates to the following project/programme financed by EU Community Funds: AMMV energy Workx project
more from H Factor
- Renewable Energy Installations for HFactor Developments · 13 Sept 2023
- HFactor Renewable Maintenance Contract · 12 Jun 2023
- Renewables at Tiffins Cafe Merthyr · 12 Jun 2023
- HFACTOR Marketing Program · 23 May 2023
- Swallow tree gardens renewable proposal · 20 Mar 2023
- Installation of Renewables at the Roadside Cafe · 7 Mar 2023
- Monitoring and evaluation of HFactor AMV Energy Worx Project · 7 Mar 2023
- installation of Solar PV and Battery Storage at Thomas and David Garage · 18 Jul 2022
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Home Energy Collective Buying Scheme - Phase 2 · West Yorkshire Combined Authority · £262,490
- Supply and/or Install of Rooftop Solar Photovoltaic Systems and Associated Equipment Y24013 · Commercial Services · £60,000,000
- PR 62 2025 Exeter City Councils Solar PV Portfolio · Exeter City Council · £1,300,000
- Provision of Installation and Commission of Solar PV for the University of Sunderland · University of Sunderland · £120,000
- TfL Solar Private Wire Delivery Partner · London Underground Limited · £175,000,000
- Battery Energy Storage Systems (BESS) · MINING REMEDIATION AUTHORITY · £296,929
- Solar PV Panels for Various Sites - Installation · Gloucestershire Health and Care NHS Foundation Trust · £249,894
- INVITATION TO TENDER for the Provision of Solar PV car ports for West Suffolk Council at Mildenhall Hub - AWARD · WEST SUFFOLK COUNCIL · £1,466,000
source
Published on Sell2Wales. Contact details for named individuals are not reproduced on this site.