installation of Solar PV and EV charging at Price Fencing, Merthyr
key details
| Category (CPV) | 09331000 +3 more |
|---|---|
| Deadline | 26 Jul 2022 |
| Procedure | open |
| OCID | ocds-kuma6s-123221 |
description
ScopeDesign a Grid Tied 36.86 kWp Photovoltaic Array and EV Charging Stations for Price Fencing & Landscaping Limited, Maesgwynne Industrial Estate, Cefn Coed, Merthyr Tydfil, CF48 2SD. The PV Inverter and PV/EV Distribution Board to be located in storage room at rear of front reception area.PV System Design.The PV system will incorporate the following points within the design.• Inverter must have minimum 12-year warranty• Type 2 surge protection built into the inverter.• Tier 1 Monocrystalline Modules with a Module Efficiency greater than 20%• Modules to have a 12 Year Warranty for Materials and Processing.• Modules to have 25-year Power output Warranty (Power Output Tolerance - ≤2% Year 1 & ≤0.55% years 2 to 25)• Safe Touch voltage technology built into the design to reduce DC voltage at loss of inverter power.• Optimisation to mitigate all types of module mismatch-loss from manufacturing tolerance to partial shading.• Optimisation to ensure maximum generation of the PV modules at panel level, minimum one for two panels.• Inverters and optimisers be manufactured from the same company• Firefighter safety switch interconnected with the onsite fire alarm panel. Safety switch to reduce string voltage to below safe DC touch voltage on alarm.• Modbus meter with CT’s at intake position to monitor Import / Export via online monitoring system.• For ease of maintenance, module level monitoring is to be included with connection to internet• By isolating the AC supply the DC circuit must reduce below DC touch safe level• Inverter selection must have built in arc fault detection according to UL1699B• Arc fault detection must reduce DC current and DC voltage.• Trapezoidal Sheet mounting system.• G99 Application for connection.• MCS registration.EV Charge PointsThe Electric Vehicle Charge points will incorporate the following in the design.• 1 x Twin 7.4kW Type 2 Mode 3Charge Point.• 1 x Single 22kW Type 2 Mode 3 Charge Point.• Key activated charging.• Built in PEN Fault Detection (No Earth Rod Requirements)• Smart Charge Point Regulations 2021 Compliant.• OZEV approved.• Warranty – Minimum 3 yearsElectrical InfrastructureA new 3 phase distribution circuit to be installed tapping off the existing Bus Bar Chamber supplying a new 3 phase PV & EV Distribution Board installed within the Storage Room. The new submain cable will have a fused switched isolator at connection to Bus Bar for isolation. The new PV & EV Distribution Board will supply power to all new components. All distribution circuits to be supported with independent containment and bracketry.AccessAccess to be supplied via scaffold with edge protection to all areas of the roof where proposed PV array is to be installed. Scaffold to have all safety permits and certificates in place before access to work granted.A site visit to site is recommended to confirm design requirements prior to pricing.NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=123221.
N/A(WA Ref:123221)Under the terms of this contract the successful supplier(s) will be required to deliver Community Benefits in support of the authority’s economic and social objectives. Accordingly, contract performance conditions may relate in particular to social and environmental considerations. The Community Benefits included in this contract are:Maximum benefit to the community will be considered as a factor in rewarding the project.encouragement of localised generation of renewable energy is an important factor.Relates to the following project/programme financed by EU Community Funds: AMMV Energy worx WEFO funded projectThe buyer considers that this contract is suitable for consortia bidding.
more from H Factor
- Renewable Energy Installations for HFactor Developments · 13 Sept 2023
- HFactor Renewable Maintenance Contract · 12 Jun 2023
- Renewables at Tiffins Cafe Merthyr · 12 Jun 2023
- HFACTOR Marketing Program · 23 May 2023
- Swallow tree gardens renewable proposal · 20 Mar 2023
- Installation of Renewables at the Roadside Cafe · 7 Mar 2023
- Monitoring and evaluation of HFactor AMV Energy Worx Project · 7 Mar 2023
- installation of Solar PV, Battery storage and EV charging at domestic dwelling in Bridgend · 19 Jul 2022
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Solar Panels on Wendell Park Primary School · London Borough of Hammersmith & Fulham · £104,650
- BCP council property solar PV and associated system installation · Bournemouth, Christchurch and Poole Council · £1,250,000
- HM/R042 - Supply of Solar Panel Systems and associated materials · Hillcrest · £284,177
- ACB B53 ROOF REPAIRS · Nuclear Restoration Services · £315,798
- Sunspot Solar Panels · ESSEX COUNTY COUNCIL · £156,335
- Supply and Install of Solar PV and Battery on Various Council Buildings · Redcar & Cleveland Borough Council
- Solar Panels Servicing and Maintenance · Plymouth Community Homes · £1,250,000
- DN783387-Lots 12 & 29-Solar Panels & Retrofit · Nottinghamshire County Council · £2,567,625
source
Published on Sell2Wales. Contact details for named individuals are not reproduced on this site.