Design & Build of a New Enterprise Engineering and Optics Centre (EEOC), Plas Coch Campus, Wrexham
key details
| Value | £8,350,000 |
|---|---|
| Status | complete |
| Category (CPV) | 45214400 +8 more |
| Region | Wales |
| Deadline | 6 Apr 2023 |
| Procedure | open |
| OCID | ocds-h6vhtk-03ae76 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| C.WYNNE & SONS LTD T/A WYNNE CONSTRUCTION | · | · | active |
description
This project, the Enterprise Engineering and Optics Centre (EEOC), is a key project to be delivered as part of the North Wales Growth Deal (now Ambition North Wales).The Growth Deal is a partnership between the public sector and the private sector, supported by funding from UK Government and Welsh Government.
The Growth Deal builds on the Growth Vision for North Wales, adopted in 2016: “a confident, cohesive region with sustainable economic growth, capitalising on the success of high value economic sectors and our connection to the economies of the Northern Powerhouse & Ireland.”
The budget for this Design & Build contract was 8.350m GBP(exclusive of VAT),10.02m GBP(including VAT). The estimated build cost was 7.5m GBP(excluding VAT),9.0m GBP(including VAT). The Actual PCSA stage cost is 235,799.50 GBP (excluding VAT), with the total cost for the Design & Build stages being 8,202,568 GBP (excluding VAT).
The main Works building project has been be procured using a two-stage Design and Build approach with a JCT Pre-Construction Services Agreement (PCSA) as well as a JCT D&B 2016 Full Form of contract.
The scope of the works include:
Carry out design process for a new 2,187m2 building at Wrexham and produce costs and all other necessary information to reach financial close
Demolish two small sections of the adjacent engineering building to facilitate the new build
Construct a new low carbon building with net zero operational carbon
Install incoming cables and other services and potentially install PV panels on buildings to meet the operational next zero targets
Move engineering equipment from adjacent buildings, and from St Asaph and Broughton sites, and commission to bring the building operational
The indicative targeted contract dates will commence from 6th June 2023 until 24th October 2023 for the Pre-Construction Services Agreement (PCSA) stage. The Design & Build contract is estimated to commence in November / December 2023 with construction build to start on site no later than 19th of February 2024.
documents
- Schedule 1 Invitation to Tender (ITT) Instructions
- Appendix 1g – Confidential or Commercially Sensitive Information
- Section 1 - Main Contract Preliminaries & General Conditions
- Section 2 - PCSA Contract Particulars
- Section 3 - Procurement Strategy
- Section 4 - Specification
- Section 5 - Pricing Document
- Appendix 2a - Drawings & Revit Model
- Appendix 2d - Cost Plan
- Appendix 2e - Schedule of Required Products
- Appendix 2f - Designer’s Obligations
- ITT Response Document PART A (Selection Questionnaire Response Document)
- Appendix 2g - ARUP Carbon Methodology
- Appendix 2h – RIBA Plan of Work 2020 Overview
- Appendix 2i – Key Performance Information (KPI) Management
- Appendix 2j – ARUP Carbon baseline assessment of the EEOC Project
- Appendix 2k – BIM Requirements
- Appendix 2l – Pre-Construction Information
- Appendix 2m – Internal Policies & Procedures
- Appendix 2n – WGU (Wrexham Glyndwr University) Site Rules
- Appendix 2b – Schedule of Amendments PCSA
- Appendix 2c - Schedule of Amendments D&B
- ITT Response Document PART B (Award Criteria Response Document)
- Form of PCG (Appendix 4 of Appendix 2c (Schedule of Amendments))
- Appendix 1a – Selection & Award Criteria Evaluation Methodology
- Appendix 2o Plas Coch Topographic Survey
- Appendix 2p underground services drawings and reports
- Appendix 2Q Arborcultural report
- Appendix 2r Ecological report
- Appendix 2s Heritage report
- Appendix 2t Landscaping
- Appendix 2u existing drainage plans
- Appendix 2a - Drawings & Revit Model
- ITT Response Document PART C (Declarations Response Document)
- Appendix 2a Revit Model (Part of updated Drawings)
- Drainage strategy drawing
- Appendix 1b – Sell2Wales Supplier Post Box Guidance
- Appendix 1c – Social Value TOMS measures & Support Network Contact Details
- Appendix 1d – Social Value Guidance &
- Appendix 1e Social Value split for PCSA and Construction Build Phases
- Appendix 1f – Top 10 High Deprivation Areas by sub-localities by County in North Wales
- Design & Build of a New Enterprise Engineering and Optics Centre (EEOC), Plas Coch Campus, Wrexham , awardNotice
- Design & Build of a New Enterprise Engineering and Optics Centre (EEOC), Plas Coch Campus, Wrexham , contractNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
3 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 6 Mar 2023 | Contract notice (F02) | Earlier regulations | 006481-2023 |
| 10 Mar 2023 | Corrigendum (F14) | Earlier regulations | 007011-2023 |
| 22 Jun 2023 | Contract award notice (F03) | Earlier regulations | 017840-2023 |
more from Glyndwr University
- The Supply of Marketing and Student Recruitment Merchandise · 19 Jun 2023
- Appointment of Internal Audit Service Provision · 27 Mar 2023
- The Supply and Delivery of a Wide Range Profilometer · £229,000 · 6 Jan 2023
- Development of a new Brand Identity for Wrexham University · 31 Oct 2022
- To provide Occupational Health & Associated Services to Students & Staff · £400,000 · 22 Jul 2022
- A Report outlining Photonics based academic capabilities and capacity within Welsh Universities · 22 Jun 2022
- A Report into the Industrial demand for Academic support and solutions in Photonics Technologies · 22 Jun 2022
- Consultancy support for network capacity building of:The Welsh Centre for Alcohol and other Drugs · 17 Jun 2022
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- External Fabric Repairs & Window Replacement at Andrew Melville Hall · University of St Andrews · £239,779
- 79 North Street – Window & Lintel Replacement · University of St Andrews · £383,256
- Alterations & Refurbishment Works (2026) at Agnes Blackadder Hall · University of St Andrews · £322,237
- Digarbon Contractor (PCSA) · CARDIFF UNIVERSITY · £7,500,000
- Student Hub Project · University of Portsmouth · £23,064,418
- Roofing & External Refurbishment Works at Old Wing, University Hall · University of St Andrews · £168,922
- UoB F101, CST & CDC Enabling Works - AWARD · University of Bedfordshire
- Chiller Replacement, Humidifier Installation & BMS Modifications (Laidlaw Music Centre) · University of St Andrews · £218,606
source
Published on Sell2Wales. Contact details for named individuals are not reproduced on this site.