ISO 11 - Fumigation Lobby Replacement Project Manager
key details
| Value | £65,000 (£78,000 inc. VAT) |
|---|---|
| Status | complete |
| Category (CPV) | 72224000 +1 more |
| Region | South East |
| Deadline | 11 Mar 2026 |
| Procedure | open |
| OCID | ocds-h6vhtk-06156f |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Grationeer Ltd | · | · | active |
description
The contract is for a single supplier to provide Project Management in relation to ISO 11 Fumigation Lobby replacement project at The Pirbright Institute, Ash Road, Pirbright, Surrey, GU24 0NF.
Existing Arrangements
The ISO 11’s fumigation lobby was installed pre-2007 and is now unserviceable as the manufacturer is no longer able to provide support due to obsolescence and inherent building design & operability shortcomings, including its capacity and physical orientation. It was decommissioned in 2017. Technical and operational issues within the ISO11 fumigation lobby are summarised below.
Technical issues:
| • | No temperature control which compromised the efficacy and limited the operation of the lobby. |
| • | Unserviceable HMI panel and obsolete software and controls lacking any Original Equipment Manufacturer (OEM) support. |
Operational issues:
| • | Unsuitable for removal of large items such as animal gating (3.0m length x 1.5m height) |
| • | Ergonomic issues including the loading area to corridor angled at 90 degrees requiring a tight manoeuvre in loading the lobby. |
As no fumigation lobby is available in ISO11, items are currently removed from the containment area of the building and taken to Plowright for fumigation following a temporary process which has associated biosafety and H&S issues and risks. This temporary process can only be implemented during the facility planned shut-down periods resulting in items accumulating in ISO11 which has impacted ISO 11 operational space. This situation is unacceptable in the long-term as highlighted by the HSE inspection conducted in March 2022.
Preferred Future Position:
The preferred future position is to have a fully functional formaldehyde lobby, accessible from within ISO11, capable of accommodating large items and equipment. This lobby should have a minimum lifespan of 15 years with fully automated controls and appropriate monitoring systems/alarms.
The space must be reconfigured by redefining the containment boundary and install a new fumigation lobby with enhanced monitoring and safety features.
There are a total of 9 (nine) Work packages, not including Project Management within the overall project. These will require procurement and delivery under the scope of Project Management:
| - | WP1: Civils and builders works package, including waste disposal |
| - | WP2: CDM, site management and welfare facilities |
| - | WP3: Modifications to vacuum drainage system |
| - | WP4: New fumigation lobby |
| - | WP5: Ventilation pressure controls |
| - | WP6: Fumigation lobby ductwork, reheat battery, pipework & controls |
| - | WP7: Local UPS supply re-feeding |
| - | WP8: HIRA studies |
| - | WP9: Access control system modifications |
documents
- https://in-tendhost.co.uk/thepirbrightinstitute/aspx/Home , biddingDocuments
- https://www.find-tender.service.gov.uk/Notice/009483-2026 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
2 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 3 Feb 2026 | Tender notice (UK4) | Procurement Act 2023 | 009483-2026 |
| 12 May 2026 | Contract details (UK7) | Procurement Act 2023 | 043607-2026 |
more from THE PIRBRIGHT INSTITUTE
- ISO11 Fumigation Lobby and Dedicated Air Handling Unit (AHU) · £151,666 · 28 Jul 2026
- Site Steam Management and Boiler Maintenance · 22 Jul 2026
- Site Steam Upgrade Project - Principal Contractor Design & Installation Package · £500,000 · 22 Jul 2026
- Provision of Planned Preventative Maintenance for Air Compressors at The Pirbright Institute · £249,555 · 7 Jul 2026
- Site HV/LV Supplies Maintenance Retender · £153,829 · 29 Jun 2026
- Plowright Formaldehyde (HCOH) Detection System Replacement · £40,000 · 29 Jun 2026
- Installation of CVIM Generator Back Up Power · £104,000 · 29 Jun 2026
- Site Emergency Generator Maintenance · £187,502 · 29 Jun 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Professional Services Support for Guildhall Project · Borough Council of Kings Lynn and West Norfolk · £27,600
- Specialist Consultancy Support · HAMPSHIRE COUNTY COUNCIL · £302,000
- AML Supervisory Reform Delivery Resource Augmentation · FCA · £223,368
- RegEx - Comms Analyst Support · FCA · £98,820
- DFTO Support for GBR Digital narrative and capability · DFT OPERATOR LIMITED
- MOD-ITS-WPG-2026-0001- Modelling works at Cape Hill · West Midlands Combined Authority · £29,600
- Sports Quater - Operational Modelling · West Midlands Combined Authority · £51,342
- Commercial Management Consultancy Services for the Metro Team - John Bryan · West Midlands Combined Authority · £87,401
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.