The purpose of this project is to increase the Institute’s sustainability (both environmental & financial), reduce carbon emissions and safeguard the steam supply to all buildings utilising steam generated at Pirbright.

This will be achieved by a combination of the following three factors:

New steam main & condensate recovery system to steam users currently served by the end of life Western Boiler House.
Removal of inefficient and end of life Western Boiler house & increasing load on the currently underutilised, efficient, EC1 steam generation plant by 450kWh (585 kg/hr).
Upgrading 2 of 4 EC1 steam boilers with burners capable of 10:1 turndown ratio to enable more efficient operation at low production rates during summer months.

Contract Scope

The contract is for a single supplier to act as the Principal Contractor and complete all works as follows:

Supporting the Stage 4 design with client nominated designer and Project Manager
Supply and Installation of EC1 steam boiler burners (x2).
Steam connection & packaged steam – LTHW interface to Engineering workshop
Enabling works for new steam & condensate return connections located on EC1 steam distribution and WBH.
Supply and installation of steam and condensate equipment.
Facilitate installation & commissioning of EC1 boiler burner replacements.
Supply and installation of new steam connection & condensate return including all required equipment.
Deliver a phased changeover of steam delivery from the WBH to the newly installed connection fed from EC1.
Decommission, removal and disposal of WBH and associated redundant equipment.
Disconnection and isolation of gas, compressed air and mains water.
Commissioning and handover including Project Information Folder (PIF) is provided to the client Project Manager.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

2 notices published against this procurement.

PublishedTypeRegimeNotice
17 Oct 2025 Tender notice (UK4) Procurement Act 2023 066245-2025
7 Jan 2026 Procurement termination (UK12) Procurement Act 2023 001102-2026

more from THE PIRBRIGHT INSTITUTE

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.