gvtcx

3rd Line Support for the Maintenance of the London Overground WestCAD & SSI Interlocking

Transport for London Published 24 Apr 2025 Find a Tender

key details

Statuscomplete
RegionNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South West
Proceduredirect
OCIDocds-h6vhtk-0506f8

Award

SupplierValueDateStatus
SIEMENS MOBILITY LIMITED £135,000 · pending

description

This is a single source for the Third line support and maintenance contract for the WestCAD signalling control and display system (SCDS) and the Solid-State Interlocking (SSI) which were developed by and installed by Siemens Mobility Limited for signalling control on the London Overground Core Windrush Line (formerly East London Line). The contract will end on the 31st July 2026.

This contract undertakes 3rd line support should faults not be rectified locally across the line. Siemens provide a 24/7 diagnostic hotline, all operational spares, escalation of fault to expert if unable to resolve and the availability of system experts in hardware/software.

This is estimated to cost during this period is £135,000 (excluding VAT).

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
24 Apr 2025 Transparency notice (UK5) Procurement Act 2023 016771-2025

more from Transport for London

all contracts from this buyer →

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.