S30075a Third Generation North Regional Traffic Model Build
key details
| Value | £600,000 |
|---|---|
| Status | complete |
| Category (CPV) | 73220000 |
| Deadline | 25 Mar 2026 |
| Contract start | 22 May 2026 |
| Contract end | 31 Mar 2028 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-c4fda139-90e8-467f-82c3-28523a117aaa |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| WSP UK LTD | £450,588 | 21 May 2026 | active |
description
In brief, this project seeks to update the NRTM2 model to a new baseline of 2025 and provide a new set of forecasts. The baseline will reflect post-COVID travel conditions which will then be carried through into the forecasts. The refreshed models will then provide a better evidential basis to support their existing use cases, as well as new and emerging use cases.
The models are required to be developed as far as is practicable in accordance with the guidance contained in TAG. The models should be calibrated and validated in line with the criteria developed for the second RTMs, with the intention to equal or improve on the second generation RTMs' calibration and validation performance.
While delivering the service, the Consultant will:
| - | Lead upon the Cal/Val Technical Consistency Group. The main activity under this Technical Consistency Group will be ensuring a consistent approach to Cal/Val is adopted by each RTM to achieve their model performance targets. |
| - | Input into the other Technical Consistency Groups led by other RTM3 model developers, providing critical challenge and following agreed upon methods. |
| - | Update the NRTM model networks in alignment with the advice set out by the Network TCG. |
| - | Update the NRTM forecasts in alignment with the advice set out by the Forecasting TCG. |
| - | Provide NRTM3 Handover Packages, including the final calibrated and validated models, as agreed in the End User TCG. |
While delivering the service, the Consultant must provide the following deliverables:
| - | A Transport Data Package report detailing the data used in the build and calibration/validation of the model, and the relative robustness of these datasets. |
| - | A Model Development Report which details the methods utilised to update the models. The Model Development Report should be akin to a Transport Model Package report. |
| - | A Forecasting Report which details the methods utilised to update the forecasts. A Forecasting Report should be akin to a Transport Forecasting Package report. |
| - | The End-user Handover Packages, which contains any relevant data analysis / modelling files relevant for end-users of the model needed for the use cases identified above, as specified by the End User Technical Consistency Group. |
| - | A National Highways Handover Package which contains any relevant handover files used by the Consultant in the development of the model, which do not end up in the End User Handover Packages. |
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 22 May 2026 | Award (award) | · | a1aa5a8a-d919-42df-8ece-389861bd6cd6-898822 |
more from National Highways Limited
- PDF Framework - A64 Grimston to Hopgrove Pavement · £552,596 · 28 Jul 2026
- PDF Framework - A3 NB & SB Thursley-Hindhead Tunnel · £1,680,475 · 28 Jul 2026
- Urban Traffic Management and Control System (UTMC) · 28 Jul 2026
- Urban Traffic Management and Control System (UTMC) · £680,700 · 28 Jul 2026
- PDF Framework - A14 J33 to J34 NRTS Ducted Network · £70,912 · 27 Jul 2026
- M42 J6 Bickenhill Structure Scheme - Ground Investigation Works · £405,767 · 27 Jul 2026
- HRE - ETC265 River Eden Viaduct · £2,341,921 · 24 Jul 2026
- pro_23431 - ITEP1131 - Network Occupancy Support Tool · £514,000 · 24 Jul 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Strategic Advice for the Real Estate Vision Plan · Guy's and St Thomas' NHS Foundation Trust · £40,000
- Liverpool City Region Transport Model Update · Liverpool City Region Combined Authority · £1,200,000
- S30084 M60 Barton High Level Bridge - Bearing Adjustment - Cat 3 checks for the substructure AIP and GI survey reviews · National Highways Limited · £330,000
- S30128 Asset delivery asset maintenance (GM701) & inspection (GS801) update · National Highways Limited · £184,967
- S30113 IS055001 Auditing Services · National Highways Limited · £178,546
- S30102 Third Party NSIPs Technical Partner · National Highways Limited · £2,500,000
- S30099 NHSS Review Implementation Phase 3 · National Highways Limited · £50,000
- S30098 Strategic Charging Infrastructure (SCI) technical partner · National Highways Limited · £1,232,140
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.