S30099 NHSS Review Implementation Phase 3
key details
| Value | £50,000 |
|---|---|
| Status | complete |
| Category (CPV) | 73220000 |
| Deadline | 12 Jun 2026 |
| Contract start | 1 Jul 2026 |
| Contract end | 31 Dec 2026 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-85a68c1a-0e90-4b29-aeb5-7026a1848c4b |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| OVE Arup | £49,947 | 16 Jun 2026 | active |
description
National Highway Sector Schemes (NHSS) are a collaborative venture between Highway Authorities, the National Accreditation Body (United Kingdom Accreditation Service (UKAS)), UKAS accredited Certification Bodies, relevant Trade Associations, Awarding Organisations and Training Providers in the United Kingdom. They were established in the mid1990s as bespoke schemes within an ISO 9001 quality management system framework. They were designed to replace existing Certification Body's schedules for the installation of highway products and where appropriate product conformity schemes.
(Most of the product conformity schemes have been replaced by requirements included in relevant harmonised European Standards, as and when they became available.)
National Highways' requirements relating to Quality Management Schemes (such as the NHSS) are contained in the Manual of Contract Documents for Highway Works (MHCW) within GC 101- General Requirements for the Specification for Highway Works. The requirement for a Quality Management Scheme, and the relevant scope of its application, is embedded within the individual specification documents where applicable. At present, NHSS is the only quality management scheme that meets National Highways requirements, but in future there may be other accepted schemes if they satisfy our requirements.
National Highways has undertaken a two-phase review of the National Highway Sector Schemes (NHSS) and the wider use of Quality Management Schemes for site-based activities. Phase 1 (2023-2024) concluded that National Highways should continue to mandate Quality Management Schemes for relevant activities but reduce reliance on specifying NHSS by name, thereby enabling appropriate equivalent schemes, supported by enhanced National Highways involvement.
Phase 2 (2024) validated Phase 1's direction and identified several implementation needs, including: (i) the lack of a clear, documented rationale for why some activities require schemes and others do not; (ii) procurement checks that are typically light-touch (certificate-based), which increases the importance of downstream assurance; and (iii) limited evidence of consistent assurance activity "on the ground" beyond checking certification remains in place. The Phase 2 report sets out implementation workstreams covering internal awareness, risk-based scheme specification by activity, procurement criteria, and strengthened assurance.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 18 Jun 2026 | Award (award) | · | c7ba7d6d-fc00-48e1-b0ba-45548b69338f-902700 |
more from National Highways Limited
- HRE - KLM/63RWS - Elderslie - Greenock Princes Pier · £247,275 · 11 Sept 2026
- HRE - KLM/68A - Elderslie - Greenock Princes Pier - Union Street · £11,984 · 11 Sept 2026
- ITEP1246 Phase 2 HADECS for the provision of Services · £1,385,000 · 11 Sept 2026
- HRE - RWR/61 - Berwickshire Branch - Leaderfoot Viaduct · £38,186 · 11 Sept 2026
- PDF Framework - Skid Resistance resurf 2026-27 North Works Pk2.07 · £400,213 · 11 Sept 2026
- PDF Framework - A31 Merley Lighting Asset Replacement · £110,585 · 11 Sept 2026
- PDF Framework - M5 Risk Reduction · £930,994 · 10 Sept 2026
- PDF Framework - M180 mp 8/0 to J3 EB & WB Pavement · £4,081,180 · 10 Sept 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- S30149 LCOR maintenance, improvements and MCI advisory · National Highways Limited · £93,989
- S30138 TLOT10211 ATE Design Assurance Services Contract · National Highways Limited · £750,000
- S30125 Integrated Customer Function Development Technical Partnership · National Highways Limited · £36,500,000
- S30135 Impulse Geophysics Surveys · National Highways Limited · £579,989
- S30108 National Highways Growth and Housing Accelerator Fund Technical Support · National Highways Limited · £2,456,657
- S30129 Road Design DMRB Standards Research & Development CD127, CD109 & CD116 · National Highways Limited · £229,672
- S30141 Technical Standards Implementation, Governance improvements and benefit realisation · National Highways Limited · £402,000
- S30133 Multi-model Corridor investment study and Active Travel pipeline development · National Highways Limited · £225,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.