Fit Out - Primary Steel Framework, Steel Sub Frames, Cladding Track, Firestops, Insulation, Retail Doors and Glazing -WP12.4.1 - Old Oak Common (S4) Station
key details
| Value | £10,000,000 |
|---|---|
| Status | active |
| Category (CPV) | 45262670 +5 more |
| Region | London |
| Deadline | 21 Feb 2025 |
| Contract start | 1 Jul 2027 |
| Contract end | 9 Dec 2030 |
| SME suitable | Yes |
| OCID | ocds-b5fd17-10501913-9ae5-4ce6-9094-0b80c99c1ae8 |
description
WP12.4.1 - Installation of primary steel framework, installation of steel sub frames, cladding tracking systems, firestops, insulation, retail doors and glazing panels for retail units within the station SAB areas.
| 1.1.1.1 | Scope: For a Subcontractor to fabricate, manufacture, and install fibre cement cladding, internal glazing and smoke downstands, and all internal structural steelwork to support the internal cladding and glazing scope to front of house and station concourse areas. The scope also to include overclad doors, skirtings trims and architectural finished louvres. Note the HS2 station internal artwork cladding panels provided by others. |
| 1.1.1.2 | The Contractor will issue a detailed design for pricing as part of the Invitation to Tender. The Subcontractor will develop the design and coordinate the interfaces of the works, ensuring it is compliant and accepted by the Project Manager prior to commencement of works. |
| 1.1.1.3 | It's anticipated the site works will commence in mid 2027 and are likely to finish end of 2030. |
Key materials for the Subcontractor to fabricate, manufacture and install:
| 1.1.1.4 | Bespoke designed steel frame curtain walling system with fixed units, steel frame curtain walling system with single glazed fixed panels - 172m2. |
| 1.1.1.5 | Bespoke fabricated single glazed stick façade system, steel frame curtain walling system with clear faced single glazed units; glazed framed doors and opaque bulkhead infill panels - 577m2. |
| 1.1.1.6 | overall size 2000 x 2500mm high; double leaf doors - 10No. |
| 1.1.1.7 | Fire stops to the ceiling level - Approximately 720m. |
| 1.1.1.8 | Bespoke designed internal steel frame system, with fire rating and acoustic requirements incorporating a combination of clear and back painted fixed single-glazed units - 466m2. |
| 1.1.1.9 | Bespoke fabricated double-glazed system with insulated panels steel frame system with glazed facade system; double glazed fixed panels - 171m2. |
| 1.1.1.10 | Bespoke fabricated double-glazed system, steel frame system with glazed facade system; double glazed fixed panels - 97m2. |
| 1.1.1.11 | Fibre cement cladding lining with stainless steel trims and stainless-steel portal frame, supported by bracketry and rails which shall be fixed back to the vertical posts - 424m2. |
| 1.1.1.12 | Metal Cladding Lining, steel panels to form a rainscreen system shall be supported by bracketry and rails, including supply and install of vertical posts - 1353m2. |
| 1.1.1.13 | Installation of approximately 760m of ceiling firestopping. |
| 1.1.1.14 | Installation of 35No double leaf doors, fixings, door jambs and headers. |
| 1.1.1.15 | Installation of louvers, glazing manifestations, skirting, roller blinds, concertina smoke screen and down stands. |
NOTE: LIN-271 is the vitreous enamel art cladding panels, this does not form part of this scope.
Further details can be found on the attached document
documents
- https://www.contractsfinder.service.gov.uk/Notice/86b23a2a-e291-4791-aba5-3e7ff942bcfd , tenderNotice
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=90178633 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 7 Feb 2025 | Tender (tender) | · | 86b23a2a-e291-4791-aba5-3e7ff942bcfd-824263 |
more from Balfour Beatty VINCI Systra JV
- WP15.03 Old Oak Common Lane (OOCL) - Highways (incl. Utilities) & IEP Depot Temp. / Permanent Road & Retaining Wall (S4) · £20,000,000 · 28 May 2026
- Traffic Management - Old Oak Common (S4) Station · £2,500,000 · 10 Mar 2026
- Fit Out - WP12.10 Statutory and Wayshowing Signage- Old Oak Common (S4) Station · £500,000 · 31 Oct 2025
- WP15 Final Highways Scope - Old Oak Common (S4) Station · £20,000,000 · 21 Aug 2025
- Labour Supply - Old Oak Common (S4) Station · £1,000,000 · 28 Jul 2025
- BBVS & HS2 Station Furniture - HS2 Phase 1 Stations - Old Oak Common (S4) Station · £5,000,000 · 13 May 2025
- WP15.04 IEP Access and Retaining Wall - Old Oak Common (S4) Station · £5,000,000 · 10 Apr 2025
- Fit Out - WP12.9 bathroom IPS and Sanitaryware Fit Out - Old Oak Common (S4) Station · £1,000,000 · 10 Jul 2024
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Metal and Brick Work Community Resilience - AWARD · Thirteen Housing Group Ltd · £26,960
- GB-St. Helens: Air Source Heat Pump protection cages · Torus Group · £60,000
- Steel Work Requirements · Redcar & Cleveland Borough Council
- Metalwork repairs to gates and associated items · NEWCASTLE CITY COUNCIL
- BE24045 - Metal discs · UK SHARED BUSINESS SERVICES LIMITED · £15,485
- Metalwork QQ · Newcastle City Council · £100,000
- Framework for Metal Fabrication and Repair Works below £30k · Sunderland City Council
- GB-London: Principal Contractor · Natural History Museum · £820,804
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.