WP15.03 Old Oak Common Lane (OOCL) - Highways (incl. Utilities) & IEP Depot Temp. / Permanent Road & Retaining Wall (S4)
key details
| Value | £20,000,000 |
|---|---|
| Status | active |
| Category (CPV) | 45233210 +1 more |
| Region | London |
| Deadline | 12 Jun 2026 |
| Contract start | 3 Jan 2028 |
| Contract end | 23 Mar 2032 |
| SME suitable | No |
| OCID | ocds-b5fd17-55751d65-1d02-4fbe-b8e3-d9bbdcc3107a |
description
WP15.03 Old Oak Common Lane (OOCL) - Highways (incl. Utilities) & IEP Depot Temp. / Permanent Road & Retaining Wall
Scope of Works:
Working in partnership with HS2, the BBVS Joint Venture is responsible for the final design, construction, and commissioning of the HS2 Old Oak Common station in West London.
The station is the London interchange station of the UK's second high-speed railway. It will be located on the site of the now demolished Old Oak Common Railway Depot, bounded by the Crossrail Depot to the north, the London Overground West London line to the east, the Intercity Express Programme Depot to the south and Old Oak Common Lane to the west. HS2, Great Western Main Line (GWML), Crossrail and Heathrow Express services will be served by the new Old Oak Common Station.
HS2 Old Oak Common Station will provide a state-of-the-art gateway to London and the wider area, with efficient intermodal interchange with rail, taxi, cycle and pedestrian modes.
Old Oak Common Lane highways package involves all the lowering, widening and realignment of the Old Oak Common Lane highway, inclusive of temporary / permanent access routes, removal of redundant utilities, installation of final utilities and civils works along Old Oak Common Lane and Wells House Road (incl. retaining walls).
BBVS is seeking to contract under NEC3 Option A with a contractor to deliver Old Oak Common Lane highways package of works that includes the following elements in summary:
| i. | IEP Depot temporary & permanent access route (incl. retaining wall construction / realignment) |
| ii. | Old Oak Common Lane highway lowering, widening & realignment (incl. street furniture, lighting and signage) |
| iii. | Removal of all redundant utilities within the highway |
| iv. | Installation of final utilities and telecoms including but not limited to clean water, foul sewer, storm sewer, non-contestable telecoms and UKPN works |
| v. | Old Oak Common Lane / Wells House Road civil engineering works including but not limited to new retaining walls and remediation of existing retaining walls |
The scope of the subcontract includes but not limited to:
| A. | The provision of all necessary People, Equipment, Plant and Materials (temporary or permanent) to deliver RIBA 5 Design, mock-ups, temporary works, fabrication, installation, and certification of the associated works |
| B. | The Subcontractor will need to demonstrate that they have the capabilities and resources to deliver the size and nature of this project in a rail environment. |
| C. | The Subcontractor will be required to produce & submit 2D/3D designs in native dgn files, working on projectwise and other software platforms. |
| D. | The Subcontractor will be required to liaise with organisations such as Transport for London, Crossrail Depot, Network Rail and Thames Water and other project stakeholders. |
Programme
It is currently anticipated that the site works will be predominantly completed between Q1 2028 and Q1 2032, with a preconstruction
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=113333609 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/3aa1f242-8ca3-4544-9f05-6d210e177884 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 28 May 2026 | Tender (tender) | · | 3aa1f242-8ca3-4544-9f05-6d210e177884-899472 |
more from Balfour Beatty VINCI Systra JV
- Traffic Management - Old Oak Common (S4) Station · £2,500,000 · 10 Mar 2026
- Fit Out - WP12.10 Statutory and Wayshowing Signage- Old Oak Common (S4) Station · £500,000 · 31 Oct 2025
- WP15 Final Highways Scope - Old Oak Common (S4) Station · £20,000,000 · 21 Aug 2025
- Labour Supply - Old Oak Common (S4) Station · £1,000,000 · 28 Jul 2025
- BBVS & HS2 Station Furniture - HS2 Phase 1 Stations - Old Oak Common (S4) Station · £5,000,000 · 13 May 2025
- WP15.04 IEP Access and Retaining Wall - Old Oak Common (S4) Station · £5,000,000 · 10 Apr 2025
- Fit Out - Primary Steel Framework, Steel Sub Frames, Cladding Track, Firestops, Insulation, Retail Doors and Glazing -WP12.4.1 - Old Oak Common (S4) Station · £10,000,000 · 7 Feb 2025
- Fit Out - WP12.9 bathroom IPS and Sanitaryware Fit Out - Old Oak Common (S4) Station · £1,000,000 · 10 Jul 2024
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- PDF Framework - A38 NB Exit to Toyota Island Pavement · National Highways Limited · £182,463
- PDF Framework - A64 Grimston to Hopgrove Pavement · National Highways Limited · £552,596
- PDF Framework - A3 NB & SB Thursley-Hindhead Tunnel · National Highways Limited · £1,680,475
- PDF Framework - A14 J33 to J34 NRTS Ducted Network · National Highways Limited · £70,912
- Supply Chain Relationship · National Highways Limited · £1,683
- PDF Framework - A38 NB SB Weeford Island - Toyota Pavement · National Highways Limited · £530,778
- PDF framework - A500 Campbell Road - Waterproofing - Structures - Construction (Pavement) · National Highways Limited · £112,611
- PDF Framework - M5 J24-25 INCL J24 EXIT AND ENTRY SLIPS SB MP 195.0-203.0 RS · National Highways Limited · £3,341,673
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.