WP15.04 IEP Access and Retaining Wall - Old Oak Common (S4) Station

Balfour Beatty VINCI Systra JV Published 10 Apr 2025 Contracts Finder

key details

Value£5,000,000
Statusactive
Category (CPV) 44212400 +1 more
RegionLondon
Deadline25 Apr 2025
Contract start6 Apr 2026
Contract end1 Dec 2028
SME suitableYes
OCIDocds-b5fd17-643c661c-fe88-4721-aa3f-db155eb6c6e6

description

WP 15.04 IEP Access and Retaining wall

Scope

The scope consists of two key components:

A new/altered access route at the west end of the Hitachi IEP Depot to facilitate construction works for the wider project.

A new retaining wall structure to retain the IEP Depot infrastructure whilst also forming the eastern boundary of the new Old Oak Common Lane alignment.

The following will be required:

Detailed design, supply and installation of the above scope.

Fully coordinated design with the existing and new Old Oak Common Lane alignments, Part 2/3 bridge structure, utilities through Old Oak Common Lane and the GWML UTX tunnels.

Provide RIBA 5 design and construction drawings including setting out detailing, general arrangements, and elevation drawings for construction.

Provide samples and construct a mock up in accordance with the Old Oak Common Lane Schedule 17 architectural requirements

IEP Depot Access Route (Stage 2) - the ramp

The existing access route in the southwest corner of the Hitachi IEP Depot needs adapting to suit Old Oak Common (BBVS and SRSA) construction traffic requirements.

IEP Depot Retaining Wall

Construction of a new bored piled retaining wall supporting the embankment to the south west corner of the IEP Depot.

Piling, plunge columns, concrete planks, masonry finish, backfilling, RC concrete

Could separate our piling/plunge columns from other works

Piling could be incorporated into the highways scope

Utility diversions to enable works above

Several existing utilities running through the IEP Depot will need to be diverted or managed before major civils and excavation works can commence. These include:

Foul sewer

Multiple LV electricity supplies

Telecoms

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
10 Apr 2025 Tender (tender) · e7f64e8b-2281-4640-aa83-3b5e885bae83-839873

more from Balfour Beatty VINCI Systra JV

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.