CT2025/C8 - Wild Strathfillan Project – Deer fence installation at Ben Lui SSSI
key details
| Value | £65,000 |
|---|---|
| Status | unsuccessful |
| Category (CPV) | 90721100 |
| Region | Scotland |
| Deadline | 30 Jun 2025 |
| Procedure | open |
| OCID | ocds-r6ebe6-0000797936 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| not named | · | · | unsuccessful |
description
We require permanent deer fencing to be supplied and installed, creating 1 deer-fenced exclosure (alignments and lengths shown in Appendix 1) with two deer-proof pedestrian access gates. The proposed fence is 1,971m in length and goes from 520-740m above sea-level.
The scope of work includes the following tasks: Site assessment and preparation
- Conduct a comprehensive site survey to determine the optimal path for the fence through the terrain, following the fence alignment shown in Appendix 1. The optimal path will be agreed with the LLTCT project officer prior to commencing works on site.
- During installation, minor deviations from the proposed fence line may be permitted; however, any significant changes must be agreed upon in advance. The acceptable level of tolerance will be confirmed during the pre-commencement meeting.
- It is anticipated that vegetation clearance along the fence line is not required.
- Ensure minimal disturbance to the surrounding habitat during mobilisation.
documents
- 2025-04 C8 Deer fence Ben Lui - New Tender brief
- 2025-04 C8-Naturescot MW Fencing options
- 2025-04 C8 Deer fence Ben Lui - New Tender brief
- CT2025/C8 - Wild Strathfillan Project – Deer fence installation at Ben Lui SSSI , contractNotice
- CT2025/C8 - Wild Strathfillan Project – Deer fence installation at Ben Lui SSSI , awardNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
more from Loch Lomond & The Trossachs Countryside Trust
- Pond and scrape creation at the Colin Burt Reserve within Wild Strathfillan · 17 Oct 2025
- Designing new woodlands for biodiversity within Wild Strathfillan. · £5,000 · 24 Oct 2024
- Wild Strathfillan Project – Deer fence installation at Crom Allt Gorge, Tyndrum · 24 Oct 2024
- Wild Strathfillan Project – Rainforest bryophytes survey and assessment · £8,000 · 18 Oct 2024
- Optimising Woodland Design for Biodiversity and Long-Term Management within Wild Strathfillan · £5,000 · 5 Aug 2024
- Wild Strathfillan - Consultancy Brief: Community Perceptions: Engagement and Attitudes Survey · £8,000 · 17 Jul 2024
- Wild Strathfillan – Hydrological survey, Colin Burt Reserve · 7 Jun 2024
- Natural Capital Investment: Community Benefit & Additionality Scoping · £20,000 · 31 Jan 2024
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- AOMR Lot 3 Routine Asset Maintenance direct award · Environment Agency · £75,673
- NCA Framework Projects - Phase III · NE
- SSD - SE FOF Lot 2 - SSD Veg Maintenance 23/24 - Secondary · Environment Agency · £38,894
- NCA Framework Projects - Phase III · NATURAL ENGLAND (Defra Network eTendering Portal)
- New Protected Landscapes Management Plan Guidance · Defra Network eTendering Portal · £20,611
- DWP Nature Recovery Plan · Department for Work and Pensions · £43,154
- Framework agreement for the provision of landscape advice · Scottish Natural Heritage · £120,000
- Japanese Knotweed Removal · Solent University · £26,000
source
Published on Public Contracts Scotland. Contact details for named individuals are not reproduced on this site.