Peatland Hydrological Restoration Works RSPB Forsinard 2022/23

RSPB Scotland Published 8 Jul 2022 Public Contracts Scotland

key details

Value£132,323
Statuscomplete
Category (CPV) 45112500
RegionScotland
Deadline13 Jun 2022
Procedureopen
OCIDocds-r6ebe6-0000693385

Award

SupplierValueDateStatus
john mackay ltd · · ·

description

Re-profiling in areas previously furrow blocked with full height dams. Sphagnum moss that has colonised the drains should be removed from the drains before infilling and placed on top of the newly reprofiled surface. Infilling will be achieved by firstly crushing down all dead tree material so that all stems and branches lie in the bottom of the furrows and below the height of the original ground surface (i.e. the section between the ploughthrows). The excavator will then use a bucket to pull stumps, brash and ridge material into furrows and cross-tracking to smooth the surface. Cross-tracking will be achieved by driving a tracked, low-ground-pressure excavator at right angles to the plough-lines to further flatten the topography and any tree material. The aim of this process will be to level the ridged ground that resulted from the ploughing operation during historical conifer plantation. This treatment will be carried out on top of existing furrow blocking.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

more from RSPB Scotland

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Public Contracts Scotland. Contact details for named individuals are not reproduced on this site.