Cyclical Repairs and External Decoration

QUALIS PROPERTY SOLUTIONS LTD Published 3 Jul 2026 Find a Tender
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£3,000,000 (£3,600,000 inc. VAT)
Statusactive
Category (CPV) 45442100 +2 more
RegionEast of England
Deadline24 Jul 2026
Procedureselective
SME suitableYes
OCIDocds-h6vhtk-06c331

description

1.0Purpose
1.1.To carry out external repairs and full redecoration to all Council‑owned dwellings and communal blocks, ensuring asset protection, extended component life and improved resident satisfaction.
1.2.Property Types
Houses
Bungalows
Low/medium-rise flat blocks
Communal internal areas
Outbuildings, garages and associated structures
1.3.Key Qualis Property Solutions Responsibilities
Pre‑works survey including checking services, access, and condition.
Tenant liaison: letter drop 14 days before works, appointment management, vulnerable tenant support.
Resident liaison/communication.
Identify asbestos or suspect materials.
1.4.Contractor Responsibilities
Full protection of tenant property and gardens.
Safe working methods and full compliance with Health & Safety and Asbestos regulations.
Quality control: schedule of condition, photographic evidence, handover pack.
Communal works to be undertaken efficiently to agreed times, to reduce inconvenience to communities.
2.0Performance Management
2.1KPIs will include:
Tenant satisfaction
Cost estimate accuracy (within 10%)
Complaint management
Health & Safety compliance
3.0Technical Requirements
3.1External repair specifications covering:
Timber (new/previously coated) Inc. fences, gates, external joinery
Metal (new/previously coated) Inc stairs, railings, gates
PVCu cleaning
Internal plaster surfaces (Communal only)
Woodstains, gloss systems, opaque systems
All previously painted external surfaces
Windows, doors, frames (timber, metal, PVCu)
Bargeboards, soffits, fascias
Rainwater goods (gutters, downpipes, hoppers)
Masonry (brick, render, texture coatings)
Balconies, balustrades, handrails
Minor roof repairs (tile replacement, flashing repairs)
All works must comply with British Standards, manufacturer guidance.
3.2Internal repair and redecorating specification: (communal only)
Ceilings
Walls
Woodwork
Metalwork
Stair balustrades
Meter cupboards/utility boxes
Flooring installation/replacement (where required in blocks)
4.0Access Requirements
4.1The Contractor will be responsible for supplying all access equipment for the required works where scaffolding or equivalent is required.
4.2The Contractor is to provide and erect all necessary scaffolding, safety boards, fans, rails, curbs, gangways, fences, etc. for the protection of the staff and general public and his own workmen.
4.3The Contractor will be required to provide a 'hand over certificate' for each independent scaffold erected.
5.0Preparation of Work
5.1Washing down
5.2Removal of loose/flaking materials
5.3Repairs to:
Decayed timber
Damaged render/brickwork
Defective gutters/downpipes
Loose fixings and ironmongery
Fungicidal treatment where required
6.0Painting & Finishing
6.1Apply systems as specified including:
Primer
Undercoat
Topcoat (one or two depending on system)
Observe:
Weather limits
Temperature/humidity constraints
Manufacturer curing times
Clean Down & Handover
Remove waste daily
Clear gutters and downpipes
Restore access and security
Provide photographic evidence
7.0Provide handover pack to include:
Survey sheets
Before/after photos
Variations
Certification (scaffold, H&S)
8.0Management & Compliance
8.1Contractor must:
Provide competent Site Supervisor
Attend monthly progress meetings
Provide full audit access
Protect confidential and personal data
Carry relevant insurance (£2m PLI)
9.0Quality & Performance Requirements
All work must be to British Standards & manufacturer requirements
Workmanship to "good industry standard"
Materials must match approved lists
10.0Defect Liability
12‑month defects period
Contractor must rectify at own cost
Emergency defect attendance: 2 hours
Routine defect attendance: 24 hours
11.0Health & Safety
11.1Contractor must comply with:
Health & Safety at Work Act 1974
CDM responsibilities (Principal Contractor role)
COSHH
Asbestos regulations (stop work immediately if found)
Secure scaffolding and fencing
Protection of tenants, staff and public
12.0Data, Records & Handover
12.1Contractor must provide:
Pre/post photos
Condition survey sheets
Measurement sheets
Variations log
Access records
KPI submissions monthly
Secure storage of personal data (destroyed after defects period)
12.2Pricing & Measurement
Works to be measured against the Schedule of Rates
Variations based on tendered SOR rates or NHF v7.2

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
3 Jul 2026 Tender notice (UK4) Procurement Act 2023 062691-2026

more from QUALIS PROPERTY SOLUTIONS LTD

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.