Kingsway Tunnel Refurbishment (Dado Panels)
key details
| Value | £4,800,000 (£6,000,000 inc. VAT) |
|---|---|
| Status | cancelled |
| Category (CPV) | 45262660 |
| Region | North West |
| Deadline | 7 Jul 2026 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-h6vhtk-06b3cb |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| not named | · | · | cancelled |
description
The contracting authority intends to procure a suitably qualified contractor to undertake refurbishment and/or replacement works to the dado panel system within the Kingsway Tunnel.
The Kingsway Tunnel is a critical piece of transport infrastructure, and the existing dado panels-forming part of the tunnel lining and safety system-require upgrade to ensure continued compliance with current safety standards, durability requirements, and operational performance.
The appointed contractor will be responsible for delivering a comprehensive programme of works, which is expected to include, but not be limited to:
Condition Assessment and Surveys: Detailed inspection of existing dado panels, fixings, and supporting structures to determine extent of deterioration, defects, and required interventions.
Design Development: Finalisation of design solutions for refurbishment and/or replacement, including materials selection, fire resistance, impact resistance, and compliance with relevant UK and EU tunnel safety standards.
Removal and Installation Works: Safe removal of existing panels where required and installation of new or refurbished dado panels, including all associated fixings, supports, and interfaces with tunnel systems.
Integration with Tunnel Systems: Coordination with existing tunnel infrastructure, including drainage, ventilation, lighting, and emergency systems, ensuring no adverse impact on operations or safety.
Traffic and Operational Management: Planning and implementation of works to minimise disruption, including phased delivery, night-time or partial closures, and coordination with tunnel operations.
Health, Safety, and Compliance: Adherence to all relevant health and safety legislation, including working in confined spaces and live highway environments, with robust risk management procedures.
Environmental Considerations: Management of waste, materials, and environmental impacts in line with applicable regulations and sustainability objectives.
Testing, Commissioning, and Handover: Inspection and verification of installed systems, ensuring compliance with specifications and provision of as-built documentation.
The works will be delivered in a highly constrained operational environment, requiring careful planning, stakeholder coordination, and experience in similar tunnel or highway infrastructure projects.
This procurement seeks to appoint a contractor with proven expertise in tunnel refurbishment, highway infrastructure works, and installation of specialist panel systems. The project outputs will contribute to the long-term safety, resilience, and operational efficiency of the Kingsway Tunnel.
documents
- https://procontract.due-north.com/SupplierRegistration/Register , biddingDocuments
- https://www.find-tender.service.gov.uk/Notice/055576-2026 , tenderNotice
- https://www.find-tender.service.gov.uk/Notice/062653-2026 , tenderCancellationNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
2 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 12 Jun 2026 | Tender notice (UK4) | Procurement Act 2023 | 055576-2026 |
| 3 Jul 2026 | Procurement termination (UK12) | Procurement Act 2023 | 062653-2026 |
more from Liverpool City Region Combined Authority
- Network Expansion: Rolling Stock Feasibility Study · £372,000 · 8 Sept 2026
- LCRCA Bus Stations (HUBS) Cleaning contract · 2 Sept 2026
- Unified Customer Relationship Management System and Contact Centre Platform · 27 Aug 2026
- LCRCA Integrated Settlement Funding for Adult Skills for academic years (August to July) 2027/28 to 2031/32 · 20 Aug 2026
- Pipeline Development Support · £40,200 · 12 Aug 2026
- Liverpool Central Station - Investment & OBC Support · £147,942 · 12 Aug 2026
- Gearbox Overhaul - Kingsway Tunnel · £384,333 · 7 Aug 2026
- Social Media Listening and Scheduling Software Solution · £90,350 · 7 Aug 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- NCC1918 - Phase 2 Asbestos Removal Works at Ashington Central Primary Upper School · Northumberland County Council · £91,368
- EPP0145 - Asbestos Removal · Tendring District Council · £300,000
- DN797629 - Wirral Council - Asbestos Removal & Encapsulation Works · Wirral Council · £719,280
- Asbestos Surveys · Cheltenham Borough Council · £3,000,000
- Asbestos removals from Colposcopy duct · QE FACILITIES LIMITED · £32,830
- Framework Agreement for Asbestos Removal & Disposal Works · Northumberland County Council · £1,600,000
- Asbestos Removal at Ashington Central Primary School · Northumberland County Council · £41,957
- Asbestos Removal Services · North West Leicestershire District Council · £600,000
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.