KINGSWAY TUNNEL REFURBISHMENT (DADO PANELS)

Merseytravel Published 1 May 2026 Find a Tender

key details

Value£3,800,000 (£4,750,000 inc. VAT)
Statusplanned
Category (CPV) 45262660
RegionNorth West
SME suitableYes
OCIDocds-h6vhtk-06905f

description

The contracting authority intends to procure a suitably qualified contractor to undertake refurbishment and/or replacement works to the dado panel system within the Kingsway Tunnel.

The Kingsway Tunnel is a critical piece of transport infrastructure, and the existing dado panels-forming part of the tunnel lining and safety system-require upgrade to ensure continued compliance with current safety standards, durability requirements, and operational performance.

The appointed contractor will be responsible for delivering a comprehensive programme of works, which is expected to include, but not be limited to:

Condition Assessment and Surveys: Detailed inspection of existing dado panels, fixings, and supporting structures to determine extent of deterioration, defects, and required interventions.

Design Development: Finalisation of design solutions for refurbishment and/or replacement, including materials selection, fire resistance, impact resistance, and compliance with relevant UK and EU tunnel safety standards.

Removal and Installation Works: Safe removal of existing panels where required and installation of new or refurbished dado panels, including all associated fixings, supports, and interfaces with tunnel systems.

Integration with Tunnel Systems: Coordination with existing tunnel infrastructure, including drainage, ventilation, lighting, and emergency systems, ensuring no adverse impact on operations or safety.

Traffic and Operational Management: Planning and implementation of works to minimise disruption, including phased delivery, night-time or partial closures, and coordination with tunnel operations.

Health, Safety, and Compliance: Adherence to all relevant health and safety legislation, including working in confined spaces and live highway environments, with robust risk management procedures.

Environmental Considerations: Management of waste, materials, and environmental impacts in line with applicable regulations and sustainability objectives.

Testing, Commissioning, and Handover: Inspection and verification of installed systems, ensuring compliance with specifications and provision of as-built documentation.

The works will be delivered in a highly constrained operational environment, requiring careful planning, stakeholder coordination, and experience in similar tunnel or highway infrastructure projects.

This procurement seeks to appoint a contractor with proven expertise in tunnel refurbishment, highway infrastructure works, and installation of specialist panel systems. The project outputs will contribute to the long-term safety, resilience, and operational efficiency of the Kingsway Tunnel.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
1 May 2026 Pipeline notice (UK1) Procurement Act 2023 040553-2026

more from Merseytravel

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.