Nant y Mwyn 25-26 Scour Protection Works

Mining Remediation Authority Published 3 Apr 2026 Find a Tender

key details

Value£100,000 (£120,000 inc. VAT)
Statuscomplete
Category (CPV) 45112450
RegionWales
Deadline5 Dec 2025
Procedureopen
SME suitableYes
OCIDocds-h6vhtk-058ec4

Award

SupplierValueDateStatus
SANCTUS LIMITED £151,416 29 Jan 2026 active

description

The purpose of these works is to prevent the Nant y Bai watercourse from continuing to scour (causing active erosion of) spoil heaps that make up its banks and causing mobilisation of metal-rich spoil into the watercourse. It is proposed to install a mixture of scour protection interventions including rock filled rolls and bags, geotextile matting and wooden stakes at a number of discrete areas along the bank to stabilise the spoil and prevent ongoing erosion by the Nant y Bai. We would welcome input from the Contractor regarding current design methodology based on previous experiences.

The Works comprise the following:

  • Install scour protection measures in accordance with the drawings;
  • Install slope stabilisation measures in accordance with the drawings;
  • Supply and install 150No. rock filled bags as specified on the drawings and as directed on site to provide scour protection in Areas 3, 5 and 6;
  • Translocate Purple Moor grass into the working area in accordance with the drawings. The source of Purple Moor grass to be agreed with the ecological supervisor but shall be within the Site;
  • Install silt traps in accordance with the drawings;
  • Install an overland pipe with associated capture structure and outfall structure in accordance with the drawings;
  • Deliver plant and materials along designated routes to limit impact on the protected ecology and provide any equipment necessary to minimize the impact on the designated routes. This may include helicopters to aid in load lifting and placement of rock roll bags; and
  • Plan and execute temporary flow diversion measures to enable the Works in the river bed to be completed.

The Works must be carried out, including transportation of plant and materials, in a way that:

  • Does not cause undue harm to the local ecology, including plants, trees and particularly the protected Calaminarian habitats (comprising metallophyte flowering and non-flowering plant species);
  • Does not damage local heritage features, including historic mining structures and artefacts;
  • Does not cause undue disruption to the local community;
  • Does not cause damage to existing services;
  • Does not cause damage to the forest track road,
  • Is in accordance with the relevant Environmental Action Plan (EAP) as prepared by the Mining Remediation Authority and agreed with NRW.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

4 notices published against this procurement.

PublishedTypeRegimeNotice
27 Aug 2025 Preliminary market engagement (UK2) Procurement Act 2023 051678-2025
7 Nov 2025 Tender notice (UK4) Procurement Act 2023 072053-2025
30 Jan 2026 Contract award (UK6) Procurement Act 2023 008381-2026
3 Apr 2026 Contract details (UK7) Procurement Act 2023 031184-2026

more from Mining Remediation Authority

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.