Mobile Plant Equipment Hire & Maintenance for Hornsey Street Transfer Station
key details
| Status | complete |
|---|---|
| Category (CPV) | 42000000 +3 more |
| Region | London |
| Deadline | 6 May 2025 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-h6vhtk-04fc73 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| STENNETTS LTD | £780,000 | 29 May 2025 | active |
description
The Contractor shall provide the following service to the Client:
[1 x Volvo L90H]
Loading Bucket
Tip of lip bucket 4.5m capacity with trash guard
RUBBER BLADE 48" - Medium 911M
1" Lock Washers - Medium Blade (qty: 13)
PLOUGH BOLT 1 x 4 (qty:13)
PLOUGH NUT 1 " (qty: 13)
Windscreen Cage Protection to fully protect the operator from debris falling from the bucket whilst maintaining maximum all round visibility.
Roll Over Protective Structures (ROPS) & Falling Object Protective Structure (FOPS) sound insulated safety care cab with environmental controls.
All Cabs to be fitted with Air Conditioning.
Air Pre-Cleaner to deal with dusty environment.
Reversing Camera
Amber warning beacon, audible reversing warning and standard reversing lights, red seat belts.
Guarantee that plant supplied will be able to run on solid TY cushion tyres and without detriment to the plant or operator.
Auto-lube on board dispenser for difficult to access greasing points, manual lubrication to ground standing operator greasing points.
Automated engine cut off that shall activate with warning if plant is left in idle mode duration for longer than 3 minutes.
Additional guarding around hydraulic hoses to minimise risk and wear and tear when in contact with waste.
Reduced emissions (compliant with all current and planned legislation regarding emission control) - Euro 6 engines
Fire Suppression System
Plant Tracking System
Load weighing systems to be installed on loading bucket to weigh material being loaded into hoppers or vehicles/containers.
Hydraulic isolator switch to ensure complete shut down of plant in an emergency.
Additional brush attachment option included required.
- x Volvo L70 H
Loading Bucket
Tip of lip bucket 4.5m capacity with trash guard
RUBBER BLADE 48" - Medium 911M
1" Lock Washers - Medium Blade (qty: 13)
PLOUGH BOLT 1 x 4 (qty:13)
PLOUGH NUT 1 " (qty: 13)
Windscreen Cage Protection to fully protect the operator from debris falling from the bucket whilst maintaining maximum all round visibility.
Roll Over Protective Structures (ROPS) & Falling Object Protective Structure (FOPS) sound insulated safety care cab with environmental controls.
All Cabs to be fitted with Air Conditioning
Air Pre-Cleaner to deal with dusty environment.
Reversing Camera
Amber warning beacon, audible reversing warning and standard reversing lights, red seat belts.
Automated engine cut off that shall activate with warning if plant is left in idle mode duration for longer than 3 minutes.
Additional guarding around hydraulic hoses to minimise risk and wear and tear when in contact with waste.
Reduced emissions (compliant with all current and planned legislation regarding emission control) - Euro 6 engines
Guarantee that plant supplied will be able to run on solid TY cushion tyres and without detriment to the plant or operator.
Auto-lube on board dispenser for difficult to access greasing points, manual lubrication to ground standing operator greasing points.
Fire Suppression System
Plant Tracking System
Load weighing systems to be installed on loading bucket to weigh material being loaded into hoppers or vehicles/containers.
Hydraulic isolator switch to ensure complete shut down of plant in an emergency.
- x JCB 3CX/JCB 4CX/JCB 5CX
Amber warning beacon, audible reversing warning and standard reversing lights.
Front mounted bucket - 1 piece 50mm wear edge
Front solid tyres
Fire Suppression System
Plant Tracking System
Windscreen Cage Protection to fully protect the operator from debris falling from the bucket whilst maintaining maximum all round visibility.
Isolator or emergency stop switch to ensure complete shut down of plant in an emergency.
Reduced emissions (compliant with all current and planned legislation regarding emission control) - Euro 6 engines
Automated engine cut off that shall activate with warning if plant is left in idle mode duration for longer than 3 minutes.
All Cabs to be fitted with Air Conditioning
Air Pre-Cleaner to deal with dusty environment.
Reversing Camera
Additional guarding around hydraulic hoses to minimise risk and wear and tear when in contact with waste.
All Cabs to be fitted with Air Conditioning.
Rear Selector Grab Attachment required for sorting recyclable materials such as metal, wood, mattresses.
The Collection Point/Affected Property/Treatment Site
The Affected Property operates 7 x days a week. Operating hours are:
Mon 07:00am-00:00
Tues-Sat 07:00am-23:30
Sunday 08:00am-17:00
Closed only Christmas Day & New Years Day
Frequency of Collection/Service/Testing
The Contractor shall provide a fully inclusive repairs and maintenance package within the base price to include collection charges and costs.
The Contractor shall guarantee that in the event of plant and equipment failure not caused by the Operator or their agents or in excess of 24 hours, the Contractor shall undertake to supply an equivalent plant at their own cost.
In the event that the Contractor is not able to supply a replacement within the agreed timeframe the Company may seek to replace with another hired plant.
The contractor shall reimburse the Company the full cost of replacement and shall include any transportation costs incurred as a result of this.
All plant and equipment shall hold a minimum of 12-month warranty.
The Contractor is to ensure that in the event of any breakdowns (within the company's operating hours) a qualified engineer shall be sent out to site to rectify within 2 hours from notification, to investigate and or remedy the fault and or supply replacement plant.
All parts failing due to general and expected wear and tear are to be replaced the Contractor at their cost. The Contractor will produce a list of parts and components which will fall within this category and are exempt within 1 month of the contract commencing.
All servicing is to be carried out in accordance with manufacturer's guidance and to the manufacturer's minimum recommended specifications.
Copies of all service records and annual inspections will be supplied to the company within 7 working days of all works being completed and retained by the Contractor for a period of 3 years from the expiry of agreement.
Upon completion of any and all servicing, maintenance and or repair works the Contractors engineer must supply a signed handover document which states what work has been undertaken and that the plant is now safe, fit for use, fully serviceable and meets all Health & Safety requirements e.g. LOLER or PUWER certification has been issued.
Costs for all part, labour and travel through wear and tear are to be included.
Solid tyres are to be supplied to begin with as a one of and thereafter will be replaced/repaired by the Company.
documents
- https://www.find-tender.service.gov.uk/Notice/014557-2025 , tenderNotice
- https://www.find-tender.service.gov.uk/Notice/Attachment/A-433 , biddingDocuments
- https://www.find-tender.service.gov.uk/Notice/Attachment/A-622 , biddingDocuments
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
4 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 3 Apr 2025 | Planned procurement (UK3) | Procurement Act 2023 | 012708-2025 |
| 11 Apr 2025 | Tender notice (UK4) | Procurement Act 2023 | 014557-2025 |
| 30 May 2025 | Contract award (UK6) | Procurement Act 2023 | 028667-2025 |
| 26 Jun 2025 | Contract details (UK7) | Procurement Act 2023 | 035558-2025 |
more from LONDONENERGY LTD
- Provision of replacement Crane Gantry Cabs · £300,000 · 2 Jul 2026
- For the provisions of Mobile Plant RRC's · £750,000 · 30 Jun 2026
- collection and treatment of food waste · 26 Mar 2026
- Third-party treatment and disposal of Mixed Municipal Waste · £800,000 · 24 Mar 2026
- Asbestos Risk Review Services · 3 Feb 2026
- For the servicing of the Continuous Emission Monitoring System · 30 Jan 2026
- For the service and maintenance of the distributed control systems · 27 Jan 2026
- Fire Water Pump Replacement · 22 Jan 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Award of ELC-26-0719 Supply of 4 x compact wheeled excavator with backhoe (SXL Mini competition, ... · East Lothian Council · £328,795
- Cannabis biodigester · The Police and Crime Commissioner for Nottinghamshire · £33,000
- Framework Agreement for in House Support Services · Rochdale Borough Council · £1,316,920
- Framework Agreement for Highways in House Support Services · Rochdale Borough Council · £23,208,976
- Supply, Installation and Commissioning of a Static Roller Packer · Leicestershire County Council · £173,100
- Air Conditioning System Servicing & Maintenance Contract at Worcester City Council Properties · Worcester City Council · £55,000
- Lift Servicing and Maintenance Contract at Worcester City Council Properties · Worcester City Council · £75,000
- GB-Cheltenham: TPPL Ubico - Cheltenham Borough Council - NEPO GM & P Lot 2 - 1 x Lyndex Bimax 145 or Equivalent, c/w 3 x 55kW Baling Press per (30118) · Ubico Limited · £482,933
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.