Legacy Concrete Roads Reconstruction Framework
key details
| Value | £968,000,000 |
|---|---|
| Status | complete |
| Category (CPV) | 45233000 +7 more |
| Region | North East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South West |
| Deadline | 26 Mar 2025 |
| Contract start | 9 Feb 2026 |
| Contract end | 8 Feb 2032 |
| Procedure | open |
| SME suitable | No |
| OCID | ocds-b5fd17-42ae9037-0c21-457b-8baf-f212e117f189 |
Awards (6)
This procurement was awarded to 3 suppliers. Values shown are per-award; the notice total is £968,000,000.
| Supplier | Value | Date | Status |
|---|---|---|---|
| John Graham Construction Ltd shared | £968,000,000 | 9 Feb 2026 | active |
| John Graham Construction Ltd shared | · | · | active |
| John Sisk and Son Ltd shared | £968,000,000 | 9 Feb 2026 | active |
| John Sisk and Son Ltd shared | · | · | active |
| Kier Transportation Limited shared | £968,000,000 | 9 Feb 2026 | active |
| Kier Transportation Limited shared | · | · | active |
description
National Highways have awarded a national framework, the Legacy Concrete Roads Reconstruction (LCRR) framework, that allows the delivery of concrete roads reconstruction schemes. The framework scope for the LCRR framework includes:
- design and subsequent construction services for:
- demolition of existing concrete pavements,
- reconstruction of pavements (including new pavement furniture and markings)
- design and delivery of associated temporary traffic management solutions,
- when instructed:
- involvement in optioneering,
- design and construction of alterations to those legacy assets which interface with the replacement pavements' designs, which may include sub-surface drainage, street furniture and its foundations and signage,
- design and construction to replace legacy central reserve with a hardened solution and overlay legacy concrete pavement with a long-life pavement solution (including new pavement furniture and markings),
- performing principal designer and principal contractor duties as defined under the "Construction (Design and Management) Regulations 2015" ("CDM Regulations 2015"),
- carbon capture recording and reporting,
- recovery, recycling and reuse of arisings during the delivery of a scheme,
- engagement with all identified stakeholders, and
- identification, recording and realisation of programme efficiencies.
The LCRR framework is six years in duration to ensure alignment to and coverage of the RIS3 funding period (2026-31) but also to overlap with the beginning of RIS4 (2031-36) in case of any delays in approvals of the strategy or funding for RIS4.
This alignment of duration with our funding periods is required from a procurement, commercial and operational perspective because it provides greater efficiency and certainty that the strategic plan for which funding is received can be delivered consistently; clarity for future procurements and sufficient time to embed learning, best practice and investment in innovations.
From a National Highways perspective, the proposed framework term allows for the RIS4 settlement to be finalised and agreed prior to the LCRR frameworks successor being procured. This will bring certainty of work and value to the future procurement.
documents
- https://nationalhighways.ukp.app.jaggaer.com/esop/ogc-host/public/nationalhighways/web/login.jst?_ncp=1668156695442.1319654-1
- https://www.contractsfinder.service.gov.uk/Notice/43f05772-5ec3-467c-b9be-a8829eaf9134 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
6 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 5 Mar 2024 | Prior information notice (F01) | Earlier regulations | 007016-2024 |
| 5 Mar 2024 | Planning (planning) | · | 81108573-5019-4d66-b5f8-efea27d282fe-729077 |
| 22 Jan 2025 | Contract notice (F02) | Earlier regulations | 002291-2025 |
| 22 Jan 2025 | Tender (tender) | · | 43f05772-5ec3-467c-b9be-a8829eaf9134-819562 |
| 3 Mar 2026 | Contract award notice (F03) | Earlier regulations | 019207-2026 |
| 3 Mar 2026 | Award (award) | · | 71daf045-4726-42a4-8fd3-0b11328a4071-886945 |
more from National Highways Limited
- HRE - WFM/836 - Maldon - Woodham Ferrers - Stow Maries Halt · £12,787 · 7 Sept 2026
- National Roads Telecommunications Service 3 (NRTS3) Independent Assurance Review · £65,000 · 5 Sept 2026
- ITEP1058 - ORT0191 - Operational Technology Standards and Specifications (Work Package 2 - Standards review) · £145,000 · 4 Sept 2026
- PDF Framework - M62 J35-J37 EB Pavement · £1,678,108 · 4 Sept 2026
- PDF Framework - A45 Thrapston to Rands RBT · £1,235,695 · 4 Sept 2026
- PDF Framework - OD-NW-PRI-Pavement A13 26 - 27 · £2,228,861 · 4 Sept 2026
- PDF Framework - A47 SB Pasture Rd-Harfreys GY rsf · £324,467 · 4 Sept 2026
- M32 Eastville Viaduct Ground Investigation BAM · £1,940,213 · 4 Sept 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Corbet Close footpath works · Bristol City Council · £25,426
- Surfacing and Planning Works at Woodhouse Lane and Ash Lane, Emley · Kirklees Council · £285,028
- Strawberry Lane 335A PROW · Bristol City Council · £76,873
- E25023 Netham Lock Traffic Signals Refurbishment · Bristol City Council · £128,861
- E24057 East Street and Cannon Street Signal Refurbishment · Bristol City Council · £52,918
- PLACE089BZ-H Mini Competition for Road Schemes · Derbyshire County Council · £661,451
- Lot 5 DN791451 Pre-Patching 2026 (South) · Bristol City Council · £372,266
- PLACE089BU-H Mini Competition for Road Resurfacing Scheme · Derbyshire County Council · £455,661