Development & Design Partnership Framework (NPR/IRP including Eastern Region)
key details
| Value | £300,000,000 |
|---|---|
| Status | complete |
| Category (CPV) | 71322000 +6 more |
| Deadline | 9 Jul 2024 |
| Procedure | selective |
| OCID | ocds-h6vhtk-03d5f1 |
Awards (4)
This procurement was awarded to 4 suppliers. Values shown are per-award; the notice total is £300,000,000.
| Supplier | Value | Date | Status |
|---|---|---|---|
| Amey OWR Limited shared | · | · | active |
| An unincorporated joint venture between AtkinsRéalis UK Limited and Arcadis Consulting (UK) Limited shared | · | · | active |
| An unincorporated joint venture between Mott MacDonald Limited and WSP UK Limited shared | · | · | active |
| An unincorporated joint venture between SYSTRA Limited and Ove Arup & Partners Limited shared | · | · | active |
description
Network Rail Infrastructure Ltd (NR) sought four suppliers to appoint to the Development and Design Partnership Framework (DDPF) to provide services and works (enabling works and intrusive surveys) for Northern Powerhouse Rail (NPR), the Integrated Rail Plan (IRP), Network North (NN) and the Eastern Region.
The geographic scope of the DDPF is the area covered by the Eastern Region (https://www.networkrail.co.uk/running-the-railway/our-regions/eastern/), as well as the routes encompassed by IRP, NN, NPR in North-West & Central.
The scope of the framework covers the provision of professional development, design, technical, and all the services to deliver Engineering Stage (ES) 1 to 5 for the DDPF. Any programme allocated to framework suppliers will be instructed to proceed through the following ES only: ES1 (Requirements defined and baselined), ES2 (Constraints identified and project feasibility confirmed), ES3 (Minimum Viable Product single option identified and endorsed), ES4 (Approval in Principle), and ES5 (Construction ready design approved and requirements validated).
The initial term of the DDPF is 5 years with an option to extend the framework by yearly increments up to a further 3 years.
The value of the framework is an estimate only, and as such, the framework value and associated workbank is not guaranteed. The workbank allocated through the framework will be subject to our client's, the Department for Transport, instruction and funding.
The DDPF's commercial model contains an incentivisation mechanism based on a weighted scorecard driven by key performance indicators. This mechanism is driven by the DDPF's Critical Success Factors, which were described in the procurement documents. The mechanism will provide a series of commercial opportunities to high-performing suppliers including advancement into further Engineering Stages for incumbent suppliers and the allocation of new programmes based on a competitive performance leaderboard.
notice history
3 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 13 Jun 2023 | Utilities periodic indicative (F04) | Earlier regulations | 016785-2023 |
| 5 Jun 2024 | Utilities contract notice (F05) | Earlier regulations | 017426-2024 |
| 26 Mar 2025 | Utilities contract award (F06) | Earlier regulations | 011384-2025 |
more from Network Rail Infrastructure Ltd
- Safety Event System – Assurance module · £997,850 · 20 Aug 2026
- 2,024,360 · 20 Aug 2026
- Pre-Market Engagement: Automated Teller Machines (ATM) and Currency Services · 17 Aug 2026
- Isolation & Associated Services · £376,000,000 · 16 Jul 2026
- CP7 Southern Region Signalling Maintenance Framework · 30 Jun 2026
- Southern Region Strategic Crime Intelligence, Security and Welfare Service · 27 May 2026
- Southern TCODs (Track Circuit Operating Devices) Maintenance · 6 May 2026
- 421018.95 · 28 Apr 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- NE - CDF - Lot 2 - Allerton MIOS - OBC-FBC ESE Contract · Environment Agency · £57,030
- Claremont Neighbourhood Design and PM · Enfield Council · £190,000
- Water Eaton Health Centre Relocation - PCSA · Milton Keynes Council · £68,344
- CO Services – Transmission Training Campus Lead Designer – 1127 · SSE plc
- Beckingham Moderation 2026 · Environment Agency · £99,385
- Lydney Harbour Pier Safety · Environment Agency · £181,364
- Contract for MEAS Round Fields Managed Realignment Detailed Design - OBC-FBC · Defra · £1,869,447
- SE - CCS CPS1 - Lot 1 - Principal Designer - WSP - CPS1-47625-2026 · Environment Agency · £294,952
source