description
MAG Framework – New install / Refurbishment
The provision of the MAG Framework is indicative and based on future requirements of all three MAG UK Airport locations which will include, New install / Refurbishment Specification for a minimum period of 3 years. The New install / Refurbishment work will be carried out in line with the capital expenditure Programme.
The scope of these works includes but is not limited to design, supply, install, test, commissioning of new elevators, escalators and auto walkways as well as decommissioning identified Elevators and Escalators. All works where possible will be carried out using Modern Methods of Construction (MMC) and Design for Manufacture & Assembly (DfMA) solutions of modularisation and prefabrication.
There is an immediate requirement which will form the basis of commercial evaluation of the Framework.
Terminal 2 Reconfiguration
- New Elevators in new Shafts
- New Elevators in Existing Shafts
- New Escalators
- Decommissioning and Removal of Existing Elevators
- Decommissioning and Removal of Existing Escalators
In addition to the outline Terminal 2 Reconfiguration scope, Contractors will be requested to provide value engineering options to modernise 4 existing Elevators and 2 Escalators in the Terminal 2 area.
Pier 2 Phase 2
- Node passenger Elevators (3 Storey)
- Node passenger Elevator (2 Storey)
- Pier gate Elevator (2 Storey)
- Pier CIP Passenger Elevator (2 Storey)
- Pier Goods Elevator (3 Storey) *requirement for beneficial Construction use on temporary power.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 22 Aug 2022 | Utilities contract notice (F05) | Earlier regulations | 023196-2022 |
more from MAG Airport PLC
- Manchester Airport Pier 2 Phase 2 - TP2300 Shell & Core · £22,000,000 · 5 Aug 2022
- Manchester Airport Terminal 2 Reconfiguration - TP2800 Steelwork · £6,000,000 · 13 May 2022
- Manchester Airport Pier 2 Phase 2 Project DFMA · £60,000,000 · 13 May 2022
all contracts from this buyer →
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.