key details
| Value | £358,000,000 |
|---|---|
| Status | complete |
| Category (CPV) | 45000000 +22 more |
| Deadline | 29 Jul 2022 |
| Procedure | limited |
| OCID | ocds-h6vhtk-032f1a |
Awards (12)
This procurement was awarded to 11 suppliers. Values shown are per-award; the notice total is £358,000,000.
| Supplier | Value | Date | Status |
|---|---|---|---|
| Amalgamated Construction Limited shared | · | · | active |
| Amalgamated Construction Ltd shared | · | · | active |
| Amey Rail Limited shared | · | · | active |
| CK Rail Solutions Ltd shared | · | · | active |
| Construction Marine Ltd shared | · | · | active |
| J Murphy & Sons shared | · | · | active |
| J Murphy & Sons Ltd shared | · | · | active |
| JSS Rail Limited shared | · | · | active |
| QTS Group Ltd shared | · | · | active |
| Story Contracting Limited shared | · | · | active |
| Taziker Industrial Limited shared | · | · | active |
| not named shared | · | · | active |
description
Network Rail has put in place a number of frameworks for Control Period 7 (CP7) for the delivery of capital works in the North West & Central Region. These frameworks are divided into categories and separate Contract Award Notices relate to each of them. On 12 February 2024 Network Rail concluded ten (10) service contracts with the Participants (as defined below) under Framework Category D.
Framework Category D relates to the delivery of “minor and reactive works” relating to planned, unplanned and cyclical maintenance requirements, with discipline specific lots for Civil Engineering and Buildings, across different geographical areas within the North West & Central Region (the “Region”). This notice contains further detail of the ongoing use of Framework Category D in line with the originally advertised scope.
The Participants are Amalgamated Construction Ltd, QTS Group Ltd, Construction Marine Ltd, J Murphy & Sons, CK Rail Solutions Ltd and JSS Rail Limited.
The scope of works carried out under Framework Category D are:
| • | Provision of emergency response capability to be able to have an initial on-site presence & response not greater than 2hrs notice (Note: Does not apply to all lots, see section II.2 for more detail on each lot) |
| • | Survey, investigation, and testing |
| • | Outline and detailed design (including temporary works) |
| • | Implementation |
| • | Enabling works for inspections and assessments |
| • | Demolition |
| • | Booking of possessions, isolations, and road closures |
| • | Statutory consents and permissions |
| • | If directed by Network Rail, third party access agreements |
The works to Network Rail’s assets may also incorporate inspection, maintenance, repair, partial or whole renewal.
Network Rail appointed suppliers to this Framework Category D across two discipline lots and geographical sub-lots as follows:
Civil Engineering (Structures & Geotechnical)
Lot D1 (O-C) Civil Engineering (Structures & Geotechnical) across the full Region: 2 Suppliers
Lot D1 (R) Civil Engineering (Structures & Geotechnical) across the full Region: 2 Suppliers
Buildings
Lot D2 (NW) Buildings in North West Route area only: 3 Suppliers
Lot D2 (C&WCS) Buildings in combined Central Route and West Coast South Route areas only: 3 Suppliers
notice history
9 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 21 Apr 2022 | Utilities periodic indicative (F04) | Earlier regulations | 010365-2022 |
| 14 Jun 2022 | Utilities contract notice (F05) | Earlier regulations | 016354-2022 |
| 14 Jun 2022 | Utilities contract notice (F05) | Earlier regulations | 016352-2022 |
| 14 Jun 2022 | Utilities contract notice (F05) | Earlier regulations | 016353-2022 |
| 11 Jan 2024 | Utilities contract award (F06) | Earlier regulations | 000928-2024 |
| 12 Feb 2024 | Utilities contract award (F06) | Earlier regulations | 004654-2024 |
| 13 Mar 2024 | Utilities contract award (F06) | Earlier regulations | 007961-2024 |
| 13 Mar 2024 | Utilities contract award (F06) | Earlier regulations | 007962-2024 |
| 8 Oct 2024 | Voluntary ex-ante transparency (F15) | Earlier regulations | 032234-2024 |
more from Network Rail Infrastructure Ltd
- Isolation & Associated Services · £376,000,000 · 16 Jul 2026
- CP7 Southern Region Signalling Maintenance Framework · 30 Jun 2026
- Southern Region Strategic Crime Intelligence, Security and Welfare Service · 27 May 2026
- Southern TCODs (Track Circuit Operating Devices) Maintenance · 6 May 2026
- 421018.95 · 28 Apr 2026
- Provision of Specialist Labour for the CP7 Conductor Rail Renewals – Wessex · 31 Mar 2026
- Creative Services Framework · £23,000,000 · 12 Mar 2026
- W&W CP7 Contract Management Services Framework - Lot 1 · £20,000,000 · 12 Mar 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Cleeve and Yatton Small Transport Hubs · North Somerset Council · £116,495
- Lowca Community School - Damp remediation works · Cumberland Council · £47,080
- 52 No New Housing Units, Rosskeen, Ross Shire · Highland Council
- L9-102 ATE Monument Roundabout · North Lincolnshire Council
- 26160 - Changing Rooms - AWARD · Telford and Wrekin Council
- Valley Primary School - Partial Roof Replacement · Cumberland Council · £62,775
- CPU 8505 - Construction of a SEND unit at Fernwood Academy School. · Nottingham City Council · £3,064,406
- 25221 - Priorslee Campus - Building M&E Fire Condition Survey - AWARD · Telford and Wrekin Council
source
Published on Find a Tender. Contact details for named individuals are not reproduced on this site.