Task Order from PDF framework for M53 SB to M56 EB DS

National Highways Published 20 Oct 2025 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£792,231
Statuscomplete
Category (CPV) 45233210
RegionNorth East, North West
Deadline5 Jun 2025
Contract start6 Jun 2025
Contract end19 Aug 2025
Procedureselective
SME suitableYes
OCIDocds-b5fd17-d282dff4-f358-4079-a27f-dc681fde124c

Award

SupplierValueDateStatus
BREEDON COLAS LIMITED £764,716 29 Apr 2025 active

description

  • 1.Principal Contractor and welfare provision (Octavius Infrastructure Limited)
  • 2.Clearance of nearside and offside overburden and minimal vegetation clearance where required only (Octavius Infrastructure Limited).
  • 3.Resurfacing as per design and specification, including various inlay depths and 0.5m inlay into hardshoulder where it drains to nearside and to edge of carriageway where drains to offside for road safety audit purposes (Breedon Colas JV)
  • 4.Installation of road markings and studs. Works to include replacing surface mounted studs with milled in studs from a previous scheme as indicated on drawings (Premier Roadmarkings Limited).
  • 5.Provision of traffic management including equipment for protection of overhead structures and powerlines, pedestrian management and diversion signage (H W Martin).
  • 6.Installation of detector loops and commissioning (Mason Street Furniture)
  • 7.Pegging and marking for sign works (Mason Street Furniture)
  • 8.Remove redundant post in front of sign, remove existing sign and posts and install 1nr traffic sign as per design. Traffic sign to be installed outside the working width of existing barrier. Traffic sign on offside to be removed is illuminated. Octavius to liaise with NH for handover to disconnect (Octavius Infrastructure Limited)
  • 9.Bridge joints to be replaced as following (VolkerLaser):
  • Little Stanney Bridge - 2nr full depth APJ replacement. The asbestos survey shows north joint depth of 95mm and south joint depth of 105mm. PC to inspect the joints when planed off surface course and see if can confirm that they are definitely APJs. If no APJ is evident seek advice and determine way forward.
  • Shropshire Union Canal - 2nr top off APJ only
  • Stoak A (M56 MP 56/1) - no works required at mechanical joint but check condition on site of nosing material following resurfacing works. 1nr full depth APJ replacement as joint is leaking when viewed from underneath structure. When replacing this joint make sure it is installed in correct alignment and not skewed like the current crack seal.
  • 10.All gullies, side entry kerbs, drainage channels etc within scheme extents need to be checked and cleared upon completion of the works to ensure that there are no obstructions/blockages (Octavius and Breedon Colas)

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
20 Oct 2025 Award (award) · dc4f333a-23a5-4d30-b101-4739429ac1eb-868753

more from National Highways

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.