Public Realm Feasibility & Options Appraisal for Science and Industry Museum Masterplan - AWARD
key details
| Status | complete |
|---|---|
| Category (CPV) | 71241000 +1 more |
| Deadline | 24 Jan 2022 |
| Contract start | 6 Mar 2022 |
| Contract end | 29 Jun 2022 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-a2f2f9fa-26b2-453a-8dcb-cab86e2fdd70 |
Awards (2)
This procurement was awarded to 2 suppliers. Values shown are per-award; the notice total is ·.
| Supplier | Value | Date | Status |
|---|---|---|---|
| BDP shared | £37,800 | 6 Mar 2022 | active |
| Planit I.E. Limited shared | £37,800 | 6 Mar 2022 | active |
description
Following the successful launch of the award-winning Special Exhibitions Gallery and with vital repairs and key projects now underway, the Science and Industry Museum is looking to focus on the next stage of their masterplan vision. Part of this is to develop the public realm proposals with the aim of developing a coherent approach to make the vast public realm spaces accessible, better connected with visitor journeys through our buildings, as well as engaging to visitors. This is an exciting opportunity to re-imagine the site in a way that reflects the museum's ambitions as well as the opportunities arising from neighbouring developments. There are also significant challenges in considering how this protected site might be developed given planning, budgetary and physical constraints.
We are looking to appoint a consultancy with experience in Urban Planning, Masterplanning, Accessible Design and Landscape Architecture to work alongside a Quantity Surveyor and an internal project team to develop a feasibility and options appraisal.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 29 Jun 2022 | Award (award) | · | ef7a343b-3ac2-427d-bd9d-6aa36d6d5802-550401 |
more from Science Museum Group
- SIM Architect and Lead Designer for Wonderlab and Power Up - AWARD · 2 Dec 2025
- Flight Gallery Improvements - Graphics - AWARD · 1 Oct 2025
- ScM Flight Gallery - Lighting Upgrades - AWARD · 1 Oct 2025
- Locomotion Exit Surveys 2024-27 - AWARD · 23 Sept 2025
- NRM Building Regulations Principal Designer - AWARD · 27 Aug 2025
- NCC Consolidation Project: Manufacture and Supply of 200 Large Pallets - AWARD · 21 Aug 2025
- Disassembly and Removal of Existing Pallet Racking and Manufacture and Installation of Adjustable Pallet Racking in Hangar L1 - AWARD · 21 Aug 2025
- Horizons Gallery Graphic Designer - AWARD · 20 Aug 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- NCC1927 Northumberland Local Plan Transport Evidence Base · Northumberland County Council · £77,752
- Full RIBA Feasibility study for Roof Replacement of Stoke Newington Town Hall · London Borough of Hackney · £50,000
- Hackney Service Centre cooling system redesign feasibility study · London Borough of Hackney · £15,000
- FCDO Port Louis New HC Residence Project RIBA Stage 4 Design Peer Review Services · Foreign Commonwealth and Development Office · £18,618
- SPS-02362A Ready To Use And Modular Prison Accommodation Options Assessment · Scottish Prison Service · £24,360
- SPS-02336 Additional Houseblock Procurement Options · Scottish Prison Service · £70,000
- SPS-02362 Ready To Use And Modular Prison Accommodation Options Assessment · Scottish Prison Service · £24,360
- Strategic Brief Development and Feasibility - AWARD · Oxford City Council · £177,900
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.