Rail Adhesion MSQ

Transport for London Published 3 Oct 2024 Contracts Finder

key details

Statusplanning
Category (CPV) 60210000
SME suitableYes
OCIDocds-b5fd17-9beb10dc-ecae-49af-82b2-1cd2172833e3

description

Transport for London's Open Innovation Team works with market innovators of all sizes to help solve some of the challenges that TfL faces where there is a need for more innovative solutions. Rather than prescribing solutions, we instead look to the market for creative, resourceful and novel approaches to problem solving to create new value for TfL by doing things better, quicker or cheaper.

Transport for London (TfL) relies on adhesion management to maintain a safe, reliable, and high-frequency railway system while preserving asset health. Both high and low friction levels at the wheel-rail interface can cause safety issues like delays, derailments, and asset damage. To address these, TfL uses various operational, procedural, and technical solutions.

During autumnal months, outdoor sections of the network (55% of the London Underground) face low adhesion due to fallen leaves mixing with iron oxides on rails. This can lead to delays, cancellations, wheel flats, and even collisions or derailments. TfL's current solutions include vegetation management, rail adhesion trains, Traction Gel Applicators, seasonal timetables, and reduced brake rates.

Any new solution must consider the diverse infrastructure of TfL's network, which includes a mix of above-ground and underground stations with varying platform dimensions and designs. The network also features different rolling stock and signalling systems, some automated and others manually driven. Service intervals range from 22 to 36 trains per hour. Any proposed solution should ensure safety across these varied conditions without compromising service frequency or asset longevity.

Problem statement:

How might we target railhead contamination such that we retain optimal (or as near as feasible) levels of friction on the railhead; allowing us to run a high-frequency service year-round regardless of the weather?

Additional information: TfL wishes to engage the market to seek feedback on emerging approaches and solutions for rail adhesion management.

Interested respondents are required to email MSQinnovation@tfl.gov.uk to request the Rail Adhesion - Market Sounding Questionnaire (MSQ) for completion by 12:00 (midday) on Monday 23 September 2024 in order to receive the MSQ.

This is a pre-procurement activity and does not imply any commitment to any future procurement process. The purpose is to seek feedback on TfL's approach, appetite from industry and information on alternative solutions that are being developed in the marketplace for similar schemes. Participation in the PIN and subsequent MSQ is not a prerequisite to, and will not prejudice, participation in any future competitive process. The information contained in this PIN or in any communication made between TfL and any supplier in connection with this should not be relied upon as constituting a contract, agreement, or representation that any contract will be offered as a result of this PIN and MSQ. If TfL decides to progress with any procurement exercise , TfL will publish a separate contract notice.

notice history

3 notices published against this procurement.

PublishedTypeRegimeNotice
12 Aug 2024 Planning (planning) · 6f685bd2-6d06-4a89-86f2-6c3a3627cfa9-776528
18 Sept 2024 Planning (planning) · 6f685bd2-6d06-4a89-86f2-6c3a3627cfa9-786384
3 Oct 2024 Planning (planning) · 6f685bd2-6d06-4a89-86f2-6c3a3627cfa9-790630

more from Transport for London

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.