NORTH HERTFORDSHIRE DISTRICT COUNCIL Published 25 Aug 2026 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£1,519,892
Statuscomplete
Category (CPV) 45315000 +1 more
RegionEast of England
Deadline18 Aug 2026
Contract start2 Sept 2026
Contract end31 Dec 2028
Procedureselective
SME suitableYes
OCIDocds-b5fd17-8e38014e-e5f0-4388-8d9a-692e77d8fc62

Award

SupplierValueDateStatus
BRIGGS & FORRESTER SPECIAL PROJECTS LIMITED £1,519,892 24 Aug 2026 active

description

This public sector decarbonisation project is split over the following two sites in North Hertfordshire:

Hitchin Town Hall and North Herts Museum, Brand St, Hitchin SG5 1HX
North Herts Leisure Centre, Baldock Rd, Letchworth Garden City SG6 2ER

Hitchin Town Hall and North Herts Museum

The project is to provide improvement to Hitchin Town Hall and North Herts Museum with particular emphasis on the reduction of energy and carbon use in its operation. Funding for the decarbonisation works is partly being provided via the Salix Public Sector Decarbonisation Grant Scheme to support the North Herts Council commitment to Net Zero operations by 2030.

In order to provide improvements in the energy use of the building, the following works are proposed:

Installation of new secondary glazing within the window reveals of existing windows.
Installation of insulation within the rood void above the Main Hall of the Town Hall.
Installation of new Photovoltaic (PV) panels on the main roof of the Museum building.
Installation of new PV panels to the eastern face of the roof of the education room of the Museum.
Replace the existing gas fired plant with air source heat pump technology & modify existing heating systems accordingly.
Replacement of existing Air Handling equipment within Town Hall and museum building.

Replacement Chiller Works at Hitchin Town Hall and North Herts Museum

In addition, the following works are proposed at Hitchin Town Hall:

Replacement chiller with expanded capacity.
Multi-split DX system for the education centre and the office on the museum side of the building.
A cooling coil for the main hall Air Handing Unit (AHU4).
Installation of air conditioning to Lucas room and 1st floor office.

North Herts Leisure Centre

The project is to provide reduction of energy and carbon us in the operation of the Learner Pool at North Herts Leisure Centre. Funding for the decarbonisation works is partly being provided via the Salix Public Sector Decarbonisation Grant Scheme to support the North Herts Council commitment to Net Zero operations by 2030.

In order to provide improvements in the energy use of the building, the following works are proposed:

Replace the existing gas fired boiler plant with air source heat pump technology & modify existing heating systems for the Learner Pool.
Provide an enclosure for the ASHP units to minimise visual impact and noise for visitors and neighbours of the site.
Provide screening planting to minimise the visual impact of the fencing around the ASHP units.

The Hitchin Town Hall and North Herts Museum and North Herts Leisure Centre will be delivering under a single JCT Design & Build contract.

Please note that the replacement chiller works will be delivered under a separate JCT Design & Build contact.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
25 Aug 2026 Award (award) · dfa17f36-79ea-4e8b-87a1-c0c60790e25c-912055

more from NORTH HERTFORDSHIRE DISTRICT COUNCIL

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.