S30069 Signal Setting Rules Safety Risk Assessment
key details
| Value | £150,000 |
|---|---|
| Status | complete |
| Category (CPV) | 73220000 |
| Deadline | 9 Mar 2026 |
| Contract start | 11 Mar 2026 |
| Contract end | 30 Apr 2026 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-8e1fe478-45e1-475e-891f-38f6233508f1 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Atkins Jacobs Joint Venture | £125,085 | 11 Mar 2026 | active |
description
National Highways Connecting the Country vision is that the strategic road network (SRN) is part of a seamlessly integrated transport system that meets our customers' needs by connecting the country safely and reliably, delivering economic prosperity, social value, and a thriving economy. It brings together our existing strategies including Route strategies, Net zero highways, Digital roads and Customer service.
Providing consistent signalling to customers is imperative to ensure customer service and deliver safety. This project will seek to provide enhanced customer service whilst maintaining safety risk as low as reasonably practicable. This is a vital part of the set of options to resolve the anomaly with HADECS and MIDAS systems.
The scope is to investigate whether the minimum off time of speed signals on the strategic road network could be altered. The SRA will consider the possible new values that could be considered safe and preferably provide a "safe operating range" that the various systems can operate to (or can be reconfigured to operate to). The assessment will need to consider if there is a universal figure for all types of speed signal or if it varies dependent on the algorithm or the purpose of the speed limit displayed.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 11 Mar 2026 | Award (award) | · | 76c8e50d-48da-47f1-902a-b1faf17e2c02-888180 |
more from National Highways Limited
- HRE - KLM/63RWS - Elderslie - Greenock Princes Pier · £247,275 · 11 Sept 2026
- HRE - KLM/68A - Elderslie - Greenock Princes Pier - Union Street · £11,984 · 11 Sept 2026
- ITEP1246 Phase 2 HADECS for the provision of Services · £1,385,000 · 11 Sept 2026
- HRE - RWR/61 - Berwickshire Branch - Leaderfoot Viaduct · £38,186 · 11 Sept 2026
- PDF Framework - Skid Resistance resurf 2026-27 North Works Pk2.07 · £400,213 · 11 Sept 2026
- PDF Framework - A31 Merley Lighting Asset Replacement · £110,585 · 11 Sept 2026
- PDF Framework - M5 Risk Reduction · £930,994 · 10 Sept 2026
- PDF Framework - M180 mp 8/0 to J3 EB & WB Pavement · £4,081,180 · 10 Sept 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- S30149 LCOR maintenance, improvements and MCI advisory · National Highways Limited · £93,989
- S30138 TLOT10211 ATE Design Assurance Services Contract · National Highways Limited · £750,000
- S30125 Integrated Customer Function Development Technical Partnership · National Highways Limited · £36,500,000
- S30135 Impulse Geophysics Surveys · National Highways Limited · £579,989
- S30108 National Highways Growth and Housing Accelerator Fund Technical Support · National Highways Limited · £2,456,657
- S30129 Road Design DMRB Standards Research & Development CD127, CD109 & CD116 · National Highways Limited · £229,672
- S30141 Technical Standards Implementation, Governance improvements and benefit realisation · National Highways Limited · £402,000
- S30133 Multi-model Corridor investment study and Active Travel pipeline development · National Highways Limited · £225,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.