Task Order from PDF framework for (619572) M60 River Irk Waterproofing Scheme
key details
| Value | £181,335 |
|---|---|
| Status | complete |
| Category (CPV) | 45233210 |
| Region | North East, North West |
| Deadline | 15 Apr 2025 |
| Contract start | 13 Jun 2025 |
| Contract end | 6 Feb 2026 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-856cc2af-b265-4ab7-8e33-c027b59f0e4a |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| BREEDON COLAS LIMITED | £181,335 | 14 Apr 2025 | active |
description
The M60 River Irk Bridge is a single-span, simply supported underbridge that carries the dual three-lane M60 Motorway and junction 19 slip roads over the River Irk and a riverside footpath. The deck consists of rolled steel beams, acting compositely with in-situ reinforced concrete slab. The deck is split into two halves, separated by a longitudinal joint in the central reserve. It is fixed at the west abutment and free at the east abutment.
The structure was commissioned in 1996 and has a design capacity of HA + 45HB.
During a previous resurfacing scheme over the bridge, the road planer damaged the deck waterproofing.
According to the Aone+ waterproofing inspection report of 2010, the damage is in lane 3 in the anticlockwise direction, near the elastomeric joint on the east side of the bridge. The report also mentions that Volker Laser repaired the small, damaged areas however, the quality of repair is not sufficient as a long-term solution. There is no assurance of 150mm overlap between the existing waterproofing and waterproofing patch repair. Therefore, a long-term waterproofing solution is required on anticlockwise carriageway from stringcourse to stringcourse.
Construction ECI was undertaken FY24/25 which included site surveys and agreement of works methodology and programme. The detailed design of the scheme has been completed by WSP
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 24 Sept 2025 | Award (award) | · | ef593689-2f57-46a2-acfe-e2179507ba85-865281 |
more from National Highways
- PDF - Framework - A120 Horsley Cross - Parkeston Rbt Harwich Safety Impt · £28,022 · 28 Nov 2025
- PDF Framework - A27 Falmer Footbridge Headroom · £2,390 · 28 Nov 2025
- PDF Framework - RM1016 Holyport interchange · £11,909 · 28 Nov 2025
- PDF Framework - A5 EB WB M42 J10 - A5148 Wall SCRIM · £302,105 · 28 Nov 2025
- PDF Framework - A23 S Downs Way, Hickstead, Pyecombe Bundle - SDF Part 2 & 3 · £3,921,468 · 28 Nov 2025
- PDF Framework - A63 Brighton Street to Daltry Street Resurfacing · £555,028 · 28 Nov 2025
- PDF Framework - M6 J9 SB & NB Bescot Viaduct Pavement Hybrid Group 43 · £40,084 · 28 Nov 2025
- GI - BAM A38 signing · £43,972 · 28 Nov 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- PDF Framework - A38 NB Exit to Toyota Island Pavement · National Highways Limited · £182,463
- PDF Framework - A64 Grimston to Hopgrove Pavement · National Highways Limited · £552,596
- PDF Framework - A3 NB & SB Thursley-Hindhead Tunnel · National Highways Limited · £1,680,475
- PDF Framework - A14 J33 to J34 NRTS Ducted Network · National Highways Limited · £70,912
- Supply Chain Relationship · National Highways Limited · £1,683
- PDF Framework - A38 NB SB Weeford Island - Toyota Pavement · National Highways Limited · £530,778
- PDF framework - A500 Campbell Road - Waterproofing - Structures - Construction (Pavement) · National Highways Limited · £112,611
- PDF Framework - M5 J24-25 INCL J24 EXIT AND ENTRY SLIPS SB MP 195.0-203.0 RS · National Highways Limited · £3,341,673
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.