Rapid Engineering Model v2
The value below is a framework or dynamic market ceiling: the maximum
that could be spent across all call-offs, not the value of a single contract.
Aggregate figures on this site exclude these to avoid double counting.
key details
| Value | £1,238,400 |
|---|---|
| Status | complete |
| Category (CPV) | 71320000 |
| Region | West Midlands |
| Deadline | 27 Jun 2018 |
| Contract start | 1 Aug 2018 |
| Contract end | 30 Apr 2019 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-66253d34-f87e-4781-a84c-5a826246a073 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Bryden Wood | £1,238,400 | 12 Jul 2018 | active |
description
The key aims of the Rapid Engineering Modelling Ver 2 ( to SGAR3/5) is to deliver greater and more efficient project level designs through:
- Highways England taking greater control of standardised modular design development
- Combined Driven/Drone based Surveying to create an accurate Digital Terrain Map Based asset platform
- Rules Based Approach to Design Development derived from the principles demonstrated through the Ops Concept works
- Reduction in the level of bespoke design resulting in increased costs due to varied design solutions in construction
- Increased safety through greater level of consistency of working practises, methods and procedures.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 16 Jul 2018 | Award (award) | · | 5c7314e3-7590-4267-9e3e-05db64d1b537-229028 |
more from Highways England
- Contract Awarded for Motorway Service Area Energy Storage Systems · £6,561,414 · 15 Feb 2023
- T0399 National Highways Sector Scheme Review · £74,373 · 13 Dec 2022
- Gantries for National Highways · £7,000 · 1 Dec 2022
- T0340 Update of Departures Manual · £39,115 · 25 Nov 2022
- TA SE&E 011 - M27 Junction 10 · £166,004 · 23 Nov 2022
- National Highways Tree/Nurseries Market Engagement · 9 Nov 2022
- A259 Dumb Bell Roundabout - Use Both Lanes traffic survey · £12,000 · 9 Nov 2022
- T0383 TRAS3074 Development of Speed-Emission/Energy Curves and Costs Data for Ultra Low Emission Vehicles · £74,519 · 4 Nov 2022
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- NMWTRA Specialist Design Services Framework Contract 2026 · Cyngor Gwynedd · £1
- CBIP-WS2-RISK REDUCTION-MDS-RIBA2-FWK1146-MDS4003 · The corporate officer for the House of Commons · £1,142,856
- Members' Tea Room Refurbishment Project - MDS4001 · The corporate office for the House of Commons · £996,592
- MDS FOR UNDERGROUND CAR PARK AND CRITICAL SERVICES WORKS · House of Commons · £921,641
- DA NEPO212 - Preliminary design of Horse and Jockey Roundabout Improvements · Stockton on Tees Borough Council
- Cryogenic Plant - Design Study - Multi Year · UK Industrial Fusion Solutions Ltd · £1,000,000
- FW Services - Offshore Structural Engineering - Multi Site 0427 · SSE plc
- Silo and ATO 97 Enabling Design · Nuclear Restoration Services Limited
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.