S30064 HS2 Interfacing Technical Support
key details
| Value | £216,000 |
|---|---|
| Status | complete |
| Category (CPV) | 73220000 |
| Deadline | 23 Jan 2026 |
| Contract start | 1 Apr 2026 |
| Contract end | 31 Mar 2030 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-56c70752-b167-471f-9d32-e47dbb3a640d |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Ove Arup | £199,409 | 26 Feb 2026 | active |
description
The UK Government has committed to the delivery of HS2 Phase One, a new high-speed rail link between London and the West Midlands. The scale and complexity of the programme means that construction and future operation of HS2 will intersect heavily with the Strategic Road Network (SRN), resulting in significant design, operational and construction-related interfaces.
The service will include providing technical advice on all HS2 interfaces with the Strategic Road Network that still have works outstanding.
The HS2 interfaces include -
| · | A43 Overbridge |
| · | A46 Kenilworth Bypass Box Slide |
| · | A45/Eastway Overbridge |
| · | BIS Area Highways |
| · | M6 J4 Improvements |
| · | M6 North Viaduct |
| · | M6 South Viaduct |
| · | M42 Coleshill Triple Box |
| · | M42/M6 Link Viaducts |
| · | M42 Water Orton Viaducts |
| · | M42 Marston Box |
| · | A5 Overbridge |
| · | A38 Streethay Overbridge |
To maintain SRN performance, safety and operational continuity during HS2 Phase One, National Highways requires specialist Geotechnical and Drainage expertise effectively manage the technical complexity and volume of ground engineering considerations affecting Strategic Road Network assets.
The Consultant's services will provide the additional technical capability needed to coordinate geotechnical & drainage assessments, ensure compliance with design standards, mitigate ground-related risks, and manage interface dependencies that exceed the capacity of core NH resource alone.
Under the direction of the National Highways, this specialist support will ensure geotechnical and drainage risks are proactively identified and controlled, technical assurance requirements are met, and HS2 works progress efficiently without compromising the safe and reliable operation of the SRN.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 26 Feb 2026 | Award (award) | · | fa850e44-861c-4aaf-8b93-c6a5135373ed-886143 |
more from National Highways Limited
- PDF Framework - A64 Grimston to Hopgrove Pavement · £552,596 · 28 Jul 2026
- PDF Framework - A3 NB & SB Thursley-Hindhead Tunnel · £1,680,475 · 28 Jul 2026
- Urban Traffic Management and Control System (UTMC) · 28 Jul 2026
- Urban Traffic Management and Control System (UTMC) · £680,700 · 28 Jul 2026
- PDF Framework - A14 J33 to J34 NRTS Ducted Network · £70,912 · 27 Jul 2026
- M42 J6 Bickenhill Structure Scheme - Ground Investigation Works · £405,767 · 27 Jul 2026
- HRE - ETC265 River Eden Viaduct · £2,341,921 · 24 Jul 2026
- pro_23431 - ITEP1131 - Network Occupancy Support Tool · £514,000 · 24 Jul 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Strategic Advice for the Real Estate Vision Plan · Guy's and St Thomas' NHS Foundation Trust · £40,000
- Liverpool City Region Transport Model Update · Liverpool City Region Combined Authority · £1,200,000
- S30084 M60 Barton High Level Bridge - Bearing Adjustment - Cat 3 checks for the substructure AIP and GI survey reviews · National Highways Limited · £330,000
- S30128 Asset delivery asset maintenance (GM701) & inspection (GS801) update · National Highways Limited · £184,967
- S30113 IS055001 Auditing Services · National Highways Limited · £178,546
- S30102 Third Party NSIPs Technical Partner · National Highways Limited · £2,500,000
- S30099 NHSS Review Implementation Phase 3 · National Highways Limited · £50,000
- S30098 Strategic Charging Infrastructure (SCI) technical partner · National Highways Limited · £1,232,140
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.