S30061 Lighting CMS (Central Management System)
key details
| Value | £500,000 |
|---|---|
| Status | complete |
| Category (CPV) | 73220000 |
| Deadline | 4 Dec 2025 |
| Contract start | 19 Dec 2025 |
| Contract end | 31 Mar 2028 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-52e81547-fd1d-4afc-bcff-049cd82aa465 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Amey OW Limited | £494,916 | 19 Dec 2025 | active |
description
As part of the National Highways LED Rollout, the organisation has set a target for 70% of streetlights to be converted to LED by 31 March 2027, supporting the broader Net Zero Carbon commitment.
This initiative includes investment in Central Management Systems (CMS) - a central software platform, designed to optimise network interventions while enhancing lighting control and energy usage monitoring. i.e. by extending lamp life, providing remote monitoring and control of energy usage and fault reporting; reducing energy usage and carbon emissions, and by removing the need for scouting / roadside visits.
CMS are essential in modern street lighting systems that dim lighting in accordance with standards and guidance, when traffic flows are lighter. However, it has become clear that the CMS is not being utilised to its full potential and requires optimisation to deliver the intended benefits.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 24 Dec 2025 | Award (award) | · | 5fd43dd0-d6d4-4fc2-9d18-69a82ec7117e-877419 |
more from National Highways Limited
- ITEP0745 - M25 DBFO Contract - icloud · £28,500 · 29 Jul 2026
- Provision of temporary additional capability within the Information Rights function · £100,000 · 29 Jul 2026
- PDF Framework - A38 NB Exit to Toyota Island Pavement · £182,463 · 29 Jul 2026
- S30119 Safety risk management continuous improvement · £72,976 · 29 Jul 2026
- PDF Framework - A64 Grimston to Hopgrove Pavement · £552,596 · 28 Jul 2026
- PDF Framework - A3 NB & SB Thursley-Hindhead Tunnel · £1,680,475 · 28 Jul 2026
- Urban Traffic Management and Control System (UTMC) · £680,700 · 28 Jul 2026
- PDF Framework - A14 J33 to J34 NRTS Ducted Network · £70,912 · 27 Jul 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- JTP Improvement Programme · Suffolk Constabulary · £13,500
- S30119 Safety risk management continuous improvement · National Highways Limited · £72,976
- Strategic Advice for the Real Estate Vision Plan · Guy's and St Thomas' NHS Foundation Trust · £40,000
- Liverpool City Region Transport Model Update · Liverpool City Region Combined Authority · £1,200,000
- S30084 M60 Barton High Level Bridge - Bearing Adjustment - Cat 3 checks for the substructure AIP and GI survey reviews · National Highways Limited · £330,000
- S30128 Asset delivery asset maintenance (GM701) & inspection (GS801) update · National Highways Limited · £184,967
- S30113 IS055001 Auditing Services · National Highways Limited · £178,546
- S30102 Third Party NSIPs Technical Partner · National Highways Limited · £2,500,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.