GB-London: 1008157290 T1414 Testing the feasibility of the use of solar reflective solutions on rolling stock
key details
| Value | £119,710 |
|---|---|
| Status | complete |
| Category (CPV) | 73110000 |
| Deadline | 27 Feb 2026 |
| Contract start | 31 Mar 2026 |
| Contract end | 30 Apr 2027 |
| SME suitable | No |
| OCID | ocds-b5fd17-4dc899f9-9021-4afd-b823-87f0422d5b41 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Engineering Support Group Ltd | £119,710 | 29 Mar 2026 | active |
description
T1414 aims to demonstrate the effective use of Solar Reflective Solutions to reduce internal vehicle temperatures, supporting improved passenger comfort, reduced HVAC energy consumption demand and improved component reliability for GB passenger rolling stock.
Work Package 1- Benchmarking and trial planning
- Assess the current performance of existing rolling stock paint systems to establish a baseline against which the potential benefit and disbenefits of adopting solar reflective alternatives can be determined.
- Identify and select SRSs which meet GB passenger rolling stock requirements to ensure the SRSs trialled meet technical, safety, and operational material requirements.
- Develop a test plan for a box trial, representative of a rail vehicle, to assess the effect that SRSs would have on internal rail vehicle temperature.
Work Package 2 - Box trials
- Undertake box trials2, representative of a rail vehicle, as per the test plan produced in WP1, to gather data on the solar, thermal and operational environment performance of SRSs.
•Analyse the data gathered from the box trials to enable cost-benefit analysis of the material systems and mitigate potential risk/unsuitable candidates.
Work Package 3 - Business case for SRS adoption
- Produce an initial business case for the use of SRSs on GB passenger rolling stock based on WP2.
Work Package 4 - Planning next steps - This will only be undertaken if business case in WP3 is positive
- Identify the questions (including technical) that remain to be answered to make informed decisions on the adoption of SRS.
- Develop a test plan for trial(s) that would answer the outstanding questions identified in WP 2 and 3 so RSSB may seek support from relevant parties and plan for such trial(s).
Note - The decision to proceed with the last work package will be made by RSSB based on the findings from WP2 and 3. The work for WP4 should be included in the total price, but with the cost separately identified to be able to be removed if WP4 is not progressed.
more from Rail Safety Standards Board (RSSB)
- GB-London: 1047912512 2026-SUS-001 Consultancy Support for a Rail Industry Social Impact Report · £28,250 · 17 Sept 2026
- GB-London: 1030972047 25-005 - Review of the operational requirements for GSMR radio - Phase 2 · £65,600 · 17 Sept 2026
- GB-London: 933860370 T1338 Evaluation of the weekly & periodic operating notices · £74,993 · 23 Jun 2025
- GB-London: 922804081 T1370 Developments on the Use of On-Train Satellite Positioning Technology Based Locators · £160,209 · 23 Jun 2025
- GB-London: 904126503 The RSSB Air Quality Monitoring Network (AQMN) · £336,806 · 15 May 2025
- 922804081 T1370 Developments on the Use of On-Train Satellite Positioning Technology Based Locators · £175,000 · 7 Mar 2025
- 922684943 T1376 Develop a GB strategy and roadmap for transitioning to the Future Railway Mobile · £175,000 · 5 Mar 2025
- GB-London: 922804081 Market Engagement Questionnaire T1370 Developments for the use of On-Train Satellite Positioning Technology Based Locators · £500,000 · 5 Feb 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- PS26107 - Responsible Innovation in collaboration with China's Engineering Biology Biofoundries · DSIT · £133,333
- Provision of Research Specification for Communications and Marketing Campaign · Government Commercial Agency · £7,225,000
- GB-London: 1047912512 2026-SUS-001 Consultancy Support for a Rail Industry Social Impact Report · Rail Safety Standards Board (RSSB) · £28,250
- GB-London: 1030972047 25-005 - Review of the operational requirements for GSMR radio - Phase 2 · Rail Safety Standards Board (RSSB) · £65,600
- RM1557.14 (2627/Aug/001/SCSWIS) Research & Advisory Services · Social Care and Social Work Improvement Scotland (Care Inspectorate) · £105,000
- Climate-Tech Innovation Partnership · Great British Energy Group Limited · £164,000
- Systems-Theoretic Process Analysis of Automated Driving Systems · DfTc - Department for Transport · £91,396
- 20215 Domestic Abuse and Stalking Perpetrator Intervention fund (DASPIF) and Children Who Use Harm Intervention Fund (CWUHIF) evaluation 2026-2029 · Home Office · £2,354,296
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.