Refurbishment of LRC Building Heating Plant (Falmouth University)

FALMOUTH EXETER PLUS Published 30 May 2018 Contracts Finder

key details

Value£80,000
Statusactive
Category (CPV) 44621220
RegionSouth West
Deadline19 Jun 2018
Contract start25 Jun 2018
Contract end10 Sept 2018
Procedureopen
SME suitableYes
OCIDocds-b5fd17-1f1ae9f8-5bdb-4b7e-a010-b806a2b795a6

description

Electrical Services

The works associated with the Electrical Services include: -

 Stripping out and making safe the existing electrical services serving the redundant heating plant

 Power and controls wiring to mechanical plant (inc. accessories).  Upgrading plantroom light fittings and installing a new external fitting.  Earthing & bonding.

 Modifications to the fire alarm system

 Gas alarm system

 Data outlet to serve the HVAC control panel

 Inspection and testing

 Provision of temporary electrical supplies during the period of the contract including power to toilet extract fan, Andrews water heater and HWSR pump.

 Testing, O&M manuals, instruction and training of Employer's staff in use of electrical and specialist installations.

Mechanical Services

The works associated with the Mechanical Services include provision of: -  Chemical cleaning & flushing of existing distribution system & emitters.  Carrying out a pre-commission of the existing heating plant and the ventilation plant.  Stripping out the existing redundant heating plant.

 Stripping out the existing redundant CWST

 Providing a new heating system to serve the building including boilers, pressurisation unit / expansion vessels, flues, pumps, pipework, insulation and commissioning / balancing.

 Minor modifications to domestic water pipework.

 Modifications to gas pipework including provision of a gas meter, gas solenoid valve etc.

 Modify / upgrade HVAC control panel and controls (including BMS outstation, programming & graphics) to serve the upgraded heating plant, metering and gas detection panel.

 Pipework insulation and valve jackets.

 Commissioning / balancing of LPHW heating systems.

 Testing, operation and maintenance manuals, instruction and training of Employer's staff in use of mechanical and specialist installations

Builderswork

The buildersworks associated with the Mechanical and Electrical Services include provision of: -

 Removing existing concrete base for redundant boilers.

 Providing new concrete base to suit proposed boilers.

Additional information: Documents can be downloaded from the In-tend tender portal: https://in-tendhost.co.uk/universityofexeter/aspx/Home

Timetable below:

ITT made available to Bidders

Wednesday 30th May 2018

Date by which Bidders will need to submit clarifications (if raised) Friday June 15th 2018 at 12.00pm mid-day Deadline for receipt of Tender

Tuesday 19th June 2018 at 12.00pm Mid-day

Evaluation Period

W/E 22ND June 2018

Preferred Bidder chosen (subject to contract)

W/C Monday 25th June 2018

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
30 May 2018 Tender amendment (tenderAmendment) · bd98d998-2492-441e-af97-422b5de9a225-218952

more from FALMOUTH EXETER PLUS

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.