S30093 Development of new Lead Safety Indicators validation and verification of selected recommended indicators
key details
| Value | £100,000 |
|---|---|
| Status | complete |
| Category (CPV) | 73220000 |
| Deadline | 15 Jun 2026 |
| Contract start | 3 Aug 2026 |
| Contract end | 31 Mar 2027 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-1d70e25a-3a5a-4416-a448-558c8f77576a |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| WSP UK LTD | £99,857 | 2 Aug 2026 | active |
description
National Highways Strategic Safety Team in the Road Safety Division want to procure through the SPaTS 3 framework a Direct Award to WSP for the continued development of Lead Safety Indicators (LSIs) project (T0631) through a re validating and verification stage. In the National Highways 2024-25 annual delivery plan we committed to developing a set of LSIs. ORR is following progress on this. It is understood that DfT is expecting at least one lead safety indicator (in addition to the existing iRAP metric) to be added to our formal organisational performance metrics during RIS3.
National Highways' key performance indicator for road user safety on the Strategic Road Network (SRN) (KPI1) is a lagging indicator, focused on impacts. A lagging indicator is reactive in nature and measures the performance of an aspiration or outcome after an event has occurred. They don't tell us how we're performing at preventing casualties and reducing future collision severity. There is also a time lag of knowing the results of a lagging indicator, for example, 2024 stats 19 data was published on 25 September 2025. Although measurable and quantifiable, lagging indicators alone are not enough, and they don't provide insight into factors that lead to those outcomes without in-depth analysis.
LSIs are proactive, preventive measures (or metrics) used to shed light on the level of safety performance achieved in a system through monitoring and intervention. A lead indicator attempts to measure control and preventative activities that precede or indicate likely failures. They are designed to understand what is happening earlier in the process in order to prevent and control lagging indicators. Therefore, to improve road safety on the SRN (and reduce KSIs), there is a need to identify, monitor and positively influence LSIs. Our iRAP performance indicator (percentage of traffic using iRAP 3 star or above rated roads, and flow-weighted decimal star rating) is a lead indicator, but as we are only able to conduct a full survey once every 5 years, we need additional measures that can provide earlier and more frequent indication of safety performance and therefore any need for change in approach or additional intervention within the 5 year period.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 6 Aug 2026 | Award (award) | · | 0f8791e2-6bbe-4302-85a5-5faa5885d8cd-909620 |
more from National Highways Limited
- PDF Framework - M5 Risk Reduction · £930,994 · 10 Sept 2026
- PDF Framework - M180 mp 8/0 to J3 EB & WB Pavement · £4,081,180 · 10 Sept 2026
- PDF Framework - M1 NB J12-J13 Resurfacing SDF · £634,474 · 10 Sept 2026
- HRE - GCL/31 - Kirklee - Finnieston (Kelvin Bridge Branch) - Kelvinbridge Tunnel / Kelvingrove Tunnel · £13,095 · 10 Sept 2026
- M62 Heathfield Landslip - Ground Investigation · £359,872 · 9 Sept 2026
- PDF Framework - A1M J62 Carrville Circulatory Resurfacing · £400,498 · 9 Sept 2026
- PDF Framework - A21 Ebden's Hill Lighting Renewal · £23,540 · 9 Sept 2026
- HRE - KLM/61 - Elderslie - Greenock Princes Pier - Lynedoch Street · £12,730 · 9 Sept 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- S30149 LCOR maintenance, improvements and MCI advisory · National Highways Limited · £93,989
- S30138 TLOT10211 ATE Design Assurance Services Contract · National Highways Limited · £750,000
- S30125 Integrated Customer Function Development Technical Partnership · National Highways Limited · £36,500,000
- S30135 Impulse Geophysics Surveys · National Highways Limited · £579,989
- S30108 National Highways Growth and Housing Accelerator Fund Technical Support · National Highways Limited · £2,456,657
- S30129 Road Design DMRB Standards Research & Development CD127, CD109 & CD116 · National Highways Limited · £229,672
- S30141 Technical Standards Implementation, Governance improvements and benefit realisation · National Highways Limited · £402,000
- S30133 Multi-model Corridor investment study and Active Travel pipeline development · National Highways Limited · £225,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.