gvtcx

3808/JN - Flue Gas/CO2 Scrubbing and Conditioning System (16 Lots)

UNIVERSITY OF SHEFFIELD Published 23 Jun 2023 Contracts Finder

key details

Value£350,000
Statuscomplete
Category (CPV) 31161200 +2 more
RegionYorkshire and the Humber
Deadline25 Jul 2023
Contract start30 Aug 2023
Contract end31 Aug 2023
Procedureopen
SME suitableYes
OCIDocds-b5fd17-0df4cf92-0dbc-4be9-a9de-6f4e790eb2b0

Awards (4)

This procurement was awarded to 2 suppliers. Values shown are per-award; the notice total is £350,000.

SupplierValueDateStatus
FuelCell Energy, Inc · · active
FuelCell Energy, Inc. £816,883 22 Aug 2023 active
FuelCell Energy, Inc. · · active
not named · · unsuccessful

description

With co-funding from the European Regional Development Fund and BEIS, the University of Sheffield is establishing a national Translational Energy Research Centre (TERC) as an integrated multi-technology, pilot-scale R&D platform for low-carbon technologies including hydrogen, bioenergy (BE), and Carbon Capture, Utilisation and Storage (CCUS). Site equipment includes a Molten Carbonate Fuel Cell (MCFC) which forms part of a Bioenergy with Carbon Capture and Storage/Utilisation (BECCS) system. The MCFC is a high temperature process capturing CO2 from combustion flues gas with simultaneous power generation. The MCFC utilises 2 sources of flue gas (individually/mixed) which are fed to the cathode side of the MCFC, and which require cleaning and conditioning:

1.Real combustion flue gas, mainly from wood grate boiler, which requires: (1) filtering, and (2) wet/dry scrubbing upstream of the MCFC.
2.Synthetic flue gas blended from compressed air, CO2 and N2 to simulate / modulate real combustion/process flue gas; the CO2 also require dry/wet scrubbing.

CO2 (synthetic) is also used on the anode side of the MCFC and requires scrubbing and conditioning before it is fed to the MCFC. The scrubbed CO2 can also be for other plants on site: primarily Fischer Tropsch (FT) Plant.

This tender covers the scrubbing and conditioning of biomass boiler flue gas (as well as synthetic/semi-synthetic flue gas) to meet stringent purity requirements of the MCFC. It also covers fuel feed to the Anode side of the MCFC. S-containing impurities as well as compounds containing halogens (e.g., HCl), As, Se and P must be scrubbed to low ppb levels to prevent poisoning of the plant catalyst.

This is an EU/FTS open exercise. The ITT can be downloaded by registering and expressing your interest on the University`s e-tendering system https://in-tendhost.co.uk/sheffield

If you have any questions or comments in relation to this tender they must be submitted via the In-tend system, this can be accessed at https://in-tendhost.co.uk/sheffield

Completed tenders must be returned through the same e-tendering system.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

4 notices published against this procurement.

PublishedTypeRegimeNotice
23 Jun 2023 Contract notice (F02) Earlier regulations 017997-2023
23 Jun 2023 Tender (tender) · 2b85d64a-f976-4317-a622-206f5982fb2b-656398
22 Sept 2023 Contract award notice (F03) Earlier regulations 028059-2023
22 Sept 2023 Award (award) · f5f51bd7-8d2c-4c66-b934-f0893f71da05-682850

more from UNIVERSITY OF SHEFFIELD

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.