S30086 Influencing the uptake of in-vehicle safety technologies and quantifying impacts
key details
| Value | £100,000 |
|---|---|
| Status | complete |
| Category (CPV) | 73220000 |
| Deadline | 17 Jul 2026 |
| Contract start | 31 Jul 2026 |
| Contract end | 31 Mar 2027 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-03a04c35-be48-499c-ba1f-4da67a681f98 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| AtkinsRéalis Jacobs Joint Venture | £99,809 | 30 Jul 2026 | active |
description
This project aims to address these challenges:
Aim (1) Quantify the performance of vehicle safety technologies "in the field" (i.e. as close as possible to actual, not ideal or "perfect use") and forecast KPI1 trends under different scenarios for input to (1) an updated RTZH model and (2) a future Safety Outcome Model to inform more accurate target setting.
Aim (2) Deliver practical evidence-based recommendations for interventions that National Highways can use to influence uptake of in-vehicle technologies that will make the biggest difference to KSI outcomes on the SRN;
These aims will be achieved via the delivery of two work packages (not including the inception/mobilisation phase which is also outlined in the description of service)
- Work Package 1 - Trends in technology uptake and safety outcomes
- Work Package 2 - User segmentation, influences and policy levers.
The Road to Zero Harm project and Safety Outcome Model projects identified gaps in our understanding of the trends in uptake and impacts of in-vehicle safety technologies.
The RTZH model relies on several assumptions about usage and effectiveness of in vehicle safety technologies. Our confidence in the validity of these assumptions is low because:
- Recent press coverage indicates usage may be overestimated due
to issues affecting user acceptance (e.g. people turning off lane
keep assist because they perceive it as annoying and potentially
dangerous - https://www.brake.org.uk/get-involved/take
action/mybrake/knowledge-centre/reports/vehicle-safety-systems-and-the future-of-driving).
- The effectiveness estimates were also based on effects estimated for whole of England (not just SRN) as part of the work to develop the GSR legislation for Europe (which is now quite old and doesn't allow for differentiating effects by road features, traffic mix and speeds).
- Lack of trend data on the uptake and usage of these technologies also prevented us including in-vehicle safety technology in the Safety Outcome model.
The first phase of this work (Spats work order S30004) delivered the following:
- Determine current prevalence and forecast trends (to 2050) in uptake of vehicle safety technologies.
- Determine the conditions under which each technology is most likely to be effective, as well as the road user groups and the crash types they are most likely to produce KSI reductions in.
- Forecast KSI savings on the SRN over time (out to 2050) in different scenarios and assess difference in magnitude of benefits.
- Review academic and grey literature to assess:
- a.perceptions of in-vehicle safety technology by road user type and socio demographic group (including age, gender, occupation and socio economic categories)
- b.levels of technology use (using objective observational measures insofar as possible, supplemented with self-report if needed) disaggregated by vehicle category and socio-demographic factors
- c.observed barriers and enab
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 3 Aug 2026 | Award (award) | · | 763e6083-0d86-4f85-9b62-0457a653b616-909278 |
more from National Highways Limited
- HRE - KLM/63RWS - Elderslie - Greenock Princes Pier · £247,275 · 11 Sept 2026
- HRE - KLM/68A - Elderslie - Greenock Princes Pier - Union Street · £11,984 · 11 Sept 2026
- ITEP1246 Phase 2 HADECS for the provision of Services · £1,385,000 · 11 Sept 2026
- HRE - RWR/61 - Berwickshire Branch - Leaderfoot Viaduct · £38,186 · 11 Sept 2026
- PDF Framework - Skid Resistance resurf 2026-27 North Works Pk2.07 · £400,213 · 11 Sept 2026
- PDF Framework - A31 Merley Lighting Asset Replacement · £110,585 · 11 Sept 2026
- PDF Framework - M5 Risk Reduction · £930,994 · 10 Sept 2026
- PDF Framework - M180 mp 8/0 to J3 EB & WB Pavement · £4,081,180 · 10 Sept 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- S30149 LCOR maintenance, improvements and MCI advisory · National Highways Limited · £93,989
- S30138 TLOT10211 ATE Design Assurance Services Contract · National Highways Limited · £750,000
- S30125 Integrated Customer Function Development Technical Partnership · National Highways Limited · £36,500,000
- S30135 Impulse Geophysics Surveys · National Highways Limited · £579,989
- S30108 National Highways Growth and Housing Accelerator Fund Technical Support · National Highways Limited · £2,456,657
- S30129 Road Design DMRB Standards Research & Development CD127, CD109 & CD116 · National Highways Limited · £229,672
- S30141 Technical Standards Implementation, Governance improvements and benefit realisation · National Highways Limited · £402,000
- S30133 Multi-model Corridor investment study and Active Travel pipeline development · National Highways Limited · £225,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.