Construction of St Michael's Hill Lecture Theatres
key details
| Value | £9,000,000 |
|---|---|
| Status | active |
| Category (CPV) | 45214400 |
| Region | South West |
| Deadline | 16 May 2019 |
| Contract start | 1 Apr 2020 |
| Contract end | 1 Apr 2022 |
| Procedure | selective |
| SME suitable | No |
| OCID | ocds-b5fd17-2b485671-8220-4cba-9959-f10a7105d96a |
description
The University of Bristol requires a Main Contractor to construct a new lecture theatre building within the Clifton precinct. The building will:
- house 3 separate lecture theatres seating 300/150/90, plus 60 study spaces,
- be on 4 levels,
- involve a concrete frame with structural steel trusses,
- be clad in stone, metal and glass,
- have a bio-diverse roof with PV panels,
- be passively ventilated, supplemented by mechanical AHU's and air source heat pumps,
- externally be landscaped and lit to encourage pedestrian access throughout the year.
The BREEAM target is "Excellent" under 2018 regulations.
The aim is to appoint a main contractor in 1Q 2020, with a start on site in 2Q20 and the building to be in operation in 2022.
A detailed planning application was submitted in March 2019.
The site contains a number of constraints and interested contractors must be able to demonstrate capability in successful delivery on similar sites.
The procurement will follow the Restricted procedure, further explained here:
- Any economic operator may submit a request to participate in this procurement by responding to the qualitative selection criteria. These criteria are based on the PAS91 Construction Pre-qualification Questionnaire, plus additional University of Bristol supplementary questions requiring suppliers to demonstrate previous experience of delivering similar projects;
- Following its assessment of the information provided (in line with the criteria set out in the documents), the University will issue an Invitation to Tender to the highest scoring suppliers;
- The Invitation to Tender will be a single-stage tender (following completion of RIBA Stage 4 by the design team), with the invitation including full details of the project;
- Responses to the ITT will be evaluated to determine the most economically advantageous tender, based on the award criteria set out in the ITT.
The University is currently progressing detailed design and intends to issue invitations to tender following completion of RIBA stage 4 in October 2019, to those suppliers shortlisted following this PQQ stage.
documents
- https://tenders.bris.ac.uk , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/f92b3d36-60b2-4c5a-9b87-66eb8b5d37bc , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 25 Mar 2019 | Tender (tender) | · | f92b3d36-60b2-4c5a-9b87-66eb8b5d37bc-278228 |
more from University of Bristol
- Provision of Thorough Examination and Testing (TExT), Maintenance and Repair of LEV Equipment not covered by Campus Division's TExT Contract · £816,000 · 24 Jul 2026
- Cryogenic System · £215,775 · 22 Jul 2026
- Photonic Component Testing System · £85,000 · 1 Jul 2026
- Die Bonding System · £215,000 · 1 Jul 2026
- Purchase of High Throughput Powder X-Ray Diffractometer · £333,332 · 19 May 2026
- Microsoft Support (2026-2029) · £111,000 · 28 Apr 2026
- Student Services Contact Cloud Centre (2026- 2029) · £141,288 · 22 Apr 2026
- Purchase of ICP-OES · £74,785 · 20 Mar 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- External Fabric Repairs & Window Replacement at Andrew Melville Hall · University of St Andrews · £239,779
- 79 North Street – Window & Lintel Replacement · University of St Andrews · £383,256
- Alterations & Refurbishment Works (2026) at Agnes Blackadder Hall · University of St Andrews · £322,237
- Digarbon Contractor (PCSA) · CARDIFF UNIVERSITY · £7,500,000
- Student Hub Project · University of Portsmouth · £23,064,418
- Roofing & External Refurbishment Works at Old Wing, University Hall · University of St Andrews · £168,922
- UoB F101, CST & CDC Enabling Works - AWARD · University of Bedfordshire
- Chiller Replacement, Humidifier Installation & BMS Modifications (Laidlaw Music Centre) · University of St Andrews · £218,606
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.