T0483 AD10 M60 Barton High Level Bridge Steady State Assessment and Category 3 Check 23/25
key details
| Value | £449,999 |
|---|---|
| Status | complete |
| Category (CPV) | 73220000 |
| Deadline | 14 Jul 2023 |
| Contract start | 27 Jul 2023 |
| Contract end | 31 Mar 2025 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-02a654af-b1cb-4283-9104-cafffe104a10 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| SPaTS Atkins and CH2M Joint Venture | £449,999 | 26 Jul 2023 | active |
description
The Area 10, Asset Support Contract completed on 31st March 2019. Since the start of the AD 10 contract on 1st April, NH has enjoyed support from SPATs framework consultants in the management of existing asset risks that traversed both contracts following the uncertainty of ASC, BBMM expertise not transferring either into NH or the DSC under TUPE legislation for the AD contract. That support has come via recent SPATs2 Framework (TO311).
A range of structures asset risks currently occupy the Area 10 Risk Register, some with enhanced inspections and live website monitoring equipment in place. These processes, procedures and interpretation of monitoring equipment and the data produced are vital to maintaining the continued safe and operation of the network where these structures are located. M60 Barton High Level Bridge currently sits within National Highways top 20, "Structures Requiring Most Consideration".
This task seeks to ensure the continuing use of expertise through this SPATs2 task to successfully manage the ongoing risks posed by the management of substandard bridges in AD 10, including the provision of essential bridge assessment and design expertise on BHLB.
In 1989 BHLB was widened. The design allowed for differential vertical movement between the piers that were constructed as part of the original bridge in 1960 and those added in the 1989 widening scheme. The resulting bridge maintenance manual from the 1989 widening scheme required the then Highways Agency, then Highways England, and now National Highways) to monitor the relative movement of the piers and their impact on the bridge deck and running lanes above. The existing piers were also thought to be suffering from Alkali Silica Reaction
A tolerance of -3mm was a condition placed in the manual that if exceeded, National Highways would need to implement a jacking scheme that would lift the bridge deck and reintroduce tolerances back into the bridge. Recent monitoring of these tolerances is indicating that they are at or beyond their limit triggering the need for a possible jacking scheme, the first of which has been implemented at Pier D, with further locations done at Piers P and Q. The pier locations over the Manchester Ship Canal are to be jacked in 2023/24 with design and check in advance of works on site.
This main risk posed is the possibility of lane restrictions on the M60 at short notice at this key location where 3 motorways converge. Part of this task seeks to further address those needs that do not warrant capital works with disproportionate costs, aimed at safety critical monitoring while limiting disruption of the M60. Interpretation of monitoring information, provided by NH 3rd party monitoring contractor suppliers, remains a key function of the appointment in further assessment of the bridge deck, which is at it limit for normal traffic loading of 40tonnes and no heavier loads above this.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 27 Jul 2023 | Award (award) | · | be67e6fa-2333-48c0-85fd-d9b9655a2e93-666607 |
more from National Highways
- PDF - Framework - A120 Horsley Cross - Parkeston Rbt Harwich Safety Impt · £28,022 · 28 Nov 2025
- PDF Framework - A27 Falmer Footbridge Headroom · £2,390 · 28 Nov 2025
- PDF Framework - RM1016 Holyport interchange · £11,909 · 28 Nov 2025
- PDF Framework - A5 EB WB M42 J10 - A5148 Wall SCRIM · £302,105 · 28 Nov 2025
- PDF Framework - A23 S Downs Way, Hickstead, Pyecombe Bundle - SDF Part 2 & 3 · £3,921,468 · 28 Nov 2025
- PDF Framework - A63 Brighton Street to Daltry Street Resurfacing · £555,028 · 28 Nov 2025
- PDF Framework - M6 J9 SB & NB Bescot Viaduct Pavement Hybrid Group 43 · £40,084 · 28 Nov 2025
- GI - BAM A38 signing · £43,972 · 28 Nov 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- JTP Improvement Programme · Suffolk Constabulary · £13,500
- S30119 Safety risk management continuous improvement · National Highways Limited · £72,976
- Strategic Advice for the Real Estate Vision Plan · Guy's and St Thomas' NHS Foundation Trust · £40,000
- Liverpool City Region Transport Model Update · Liverpool City Region Combined Authority · £1,200,000
- S30084 M60 Barton High Level Bridge - Bearing Adjustment - Cat 3 checks for the substructure AIP and GI survey reviews · National Highways Limited · £330,000
- S30128 Asset delivery asset maintenance (GM701) & inspection (GS801) update · National Highways Limited · £184,967
- S30113 IS055001 Auditing Services · National Highways Limited · £178,546
- S30102 Third Party NSIPs Technical Partner · National Highways Limited · £2,500,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.