Priory Road (Southampton) Property Level Protection Scheme - Supply and Installation of Property Level Protection Measures to Residential Properties
key details
| Value | £170,000 |
|---|---|
| Status | active |
| Category (CPV) | 45246400 |
| Region | South East |
| Deadline | 8 May 2017 |
| Contract start | 1 Jun 2017 |
| Contract end | 31 Dec 2017 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-b834e869-d90e-48df-a19a-a64b0c0af5ff |
description
In 2015, Southampton City Council (SCC) successfully completed the Belsize Flood Resilience Project funded by the Defra Community Resilience Pathfinder Scheme. The project reduced flood risk to 41 properties through a mix of Property Level Protection (PLP) and a community level flood wall. During the project, a study into the understanding of flood risk interactions was commissioned revealing that flood risk in the area had previously been underestimated, placing more properties in the very significant flood category.
In May 2016, SCC applied for a Local Levy Grant from the Environment Agency to extend the roll out of PLP to the newly identified at risk properties. The aim of the Priory Road Property Level Protection scheme is to reduce the impact of flooding to a further thirty residential properties which have been identified as being within the very significant risk category through the flood risk interactions work undertaken as part of the Belsize Flood Resilience Project.
The residential properties in this project consist of a mix of detached, semi-detached and terraced properties.
Additional information: Applicants will be required to apply via "Supply Southampton" website which can be accessed via, https://supplysouthampton.esourcingportal.com/ where you can register your details and access documentation. All documentation including questionnaires must be completed and submitted by no later than the time/date indicated. The Council undertakes to use reasonable endeavours to hold confidential any information provided in the proposal submitted, subject to the Council's obligations under law, including the Freedom of Information Act 2000. If the applicant considers that any of the information submitted in the proposal should not be disclosed because of its sensitivity then this should be stated with the reason for considering it sensitive. The Council will then consider the sensitivity statement before replying to any request received under the Freedom of Information Act 2000. Any enquiries regarding the tender process must be directed through the website to the Curtis Fitch System.
documents
- https://supplysouthampton.esourcingportal.com/ , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/c3b2ab6c-fc6c-4692-a1ea-c11bc4d775f7 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 5 Apr 2017 | Tender (tender) | · | c3b2ab6c-fc6c-4692-a1ea-c11bc4d775f7-139927 |
more from SOUTHAMPTON CITY COUNCIL
- Mayflower Play Area · £99,975 · 21 Jul 2026
- Mayflower Park Demolition · £32,814 · 21 Jul 2026
- External improvement works identified at Tarant Road · £97,853 · 22 Jun 2026
- Fencing Works · £30,490 · 17 Jun 2026
- Botany Bay Road Ditch Works · £36,120 · 4 Jun 2026
- Pride in Place Old Town Heritage & Green Space Improvements. · £49,540 · 4 Jun 2026
- Works to improve Public Realm - Western Esplanade · £50,000 · 4 Jun 2026
- PHILIS Software licence & support fees agreement · £30,000 · 28 May 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Additional Properties- Project Groundwater (Heighington) · Lincolnshire County Council · £125,100
- Flood Telemetry Devices · Nottinghamshire County Council
- 20251009_Plannning SFRA · Council of the Isles of Scilly · £15,000
- YNE-AOMR-Barmston · DEFRA · £92,432
- WMD-PFR-Barton to New Holland Lot 2 · Environment Agency
- NW PFR Lot 2 Stockdalewath Installation · Environment Agency · £350,000
- Essex Flood Studies 2026 · ESSEX COUNTY COUNCIL · £223,473
- NW CDF Preston and South Ribble FRMS Phase 3/4 Construction Design Support · Environment Agency · £171,903
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.