South Cambridgeshire District Council - Water Cycle Study and Strategic Flood Risk Assessment for Greater Cambridge
key details
| Status | complete |
|---|---|
| Category (CPV) | 90712100 |
| Region | East of England |
| Deadline | 28 Feb 2020 |
| Contract start | 4 May 2020 |
| Contract end | 31 Mar 2024 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-a0d4ae9d-0dc5-4683-9761-7309c913ac4f |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Stantec UK (formerly Peter Brett Associates) | £74,993 | 26 Mar 2020 | active |
description
Cambridge City Council and South Cambridgeshire District Council (the Councils) are producing a joint Greater Cambridge Local Plan which will cover the combined area of these local authorities. The Councils are seeking suitably qualified consultants to carry out an Integrated Water Management Study to provide a robust evidence base for the development of the Greater Cambridge (GC) Local Plan. This will consist of an:
| • | Outline and detailed Water Cycle Study (WCS); and |
| • | Level 1 Strategic Flood Risk Assessment (SFRA). |
The aim is that this is an integrated study, given the overlaps between all aspects of the water environment and the same stakeholders being involved with both studies. The flooding evidence gathered from the SFRA should be fed into the WCS, and similarly relevant evidence collected for the WCS used for the SFRA.
The aim of the Water Cycle Study (WCS) is to look at all aspects of the water environment and ensure that water infrastructure can be managed sustainably alongside the level of growth being identified as the Local Plan is developed. It is expected that consultants will look at:
| • | water resources and supply systems, including non-potable water re-use; |
| • | water quality and Water Framework Directive status; |
| • | wastewater and treatment provision and capacity; |
| • | surface water drainage and treatment; |
| • | flood risk management / mitigation (with obvious links to the SFRA) |
| • | opportunities to integrate the various aspects of water management |
documents
- https://procontract.due-north.com/Advert?advertId=596636f3-7742-ea11-80ff-005056b64545 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/2f4b62ca-245b-40e1-82ac-d71be2471f8b , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 26 Mar 2020 | Award (award) | · | 57ea6808-0e79-4816-8454-935df0a84e6f-351728 |
more from South Cambridgeshire District Council
- South Cambridgeshire District Council - Strength & Balance Activity Delivery · 2 Jul 2026
- South Cambridgeshire District Council - 270 CSP Internal Works Contract · 5 Jun 2026
- South Cambridgeshire District Council - Independent Examiner for Community Infrastructure Levy Charging Schedules · 2 Jun 2026
- South Cambridgeshire District Council - Webbs Hole Pumping Station Responsive and Planned Maintenance · 17 Mar 2026
- South Cambridgeshire District Council - Local Plan Programme Officer · 6 Mar 2026
- South Cambridgeshire District Council - Advertising Sales Contract · 24 Feb 2026
- South Cambridgeshire District Council - South Cambs Magazine Delivery Contract · 24 Feb 2026
- South Cambridgeshire District Council - Reinstatement Evaluation · 17 Feb 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Development Management Advice and Auditing Support Services · Transport Scotland · £3,000,000
- A9(T) Tore Modelling · Transport Scotland · £89,330
- Delivery Manager Support for Active Travel & 20mph Programme on the Trunk Road Network · Transport Scotland · £211,000
- Auditing and Reporting on Submitted Transport Assessments and Environmental Impact Assessments relating to Section 36 Applications · Transport Scotland · £288,000
- Visioning & Master Planning · East Renfrewshire Council · £90,600
- MBC-1503-S-OPE Planning Productivity Plan · Melton Borough Council · £150,000
- Cycle Trunk Route Scoping Support · South Gloucestershire Council · £48,500
- Infrastructure Delivery Plan, Cotswold District Council - AWARD · Cotswold District Council
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.