T0680 Validation of integral bridge abutment design methods - phase 3
key details
| Value | £149,153 |
|---|---|
| Status | complete |
| Category (CPV) | 73220000 |
| Deadline | 14 May 2025 |
| Contract start | 11 Jun 2025 |
| Contract end | 30 Mar 2030 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-6c1c385d-e0c5-4df6-8d4d-004322925f4a |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Atkins Jacobs Joint Venture | £149,153 | 10 Jun 2025 | active |
description
This work is looking to provide evidence to improve our understanding of behaviour of integral bridges and validate against numerical modelling and the current BS PD 6694-1 (Recommendations for the design of structures subject to traffic loading to BS EN 1997-1:2004+A1:2013) referenced in CS459 predictions to enable the development of an improved calculation approach for integral bridges more broadly.
This will be achieved by capturing and analysing data over a continuous period of 5 years from the time of construction to support investigation of the soil structure interaction and overall bridge performance. Data will then be interpreted to support analysis of the DMRB.
The strategic objectives of the project are:
| - | to safely improve the design of construction while reducing capital and carbon costs by more efficient use of materials in future integral bridge construction; |
| - | to provide accurate and reliable measurements to understand the total life cycle for these structures; |
| - | to extend the span length where these type of structures can be sensibly adopted; |
| - | to improve acceptance of this type of structures to further reduce the need for bridge bearings which require periodic disruptive replacement |
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 2 Jul 2025 | Award (award) | · | 6730baa1-446c-4d68-a7ed-aaf867197b98-852476 |
more from National Highways
- PDF - Framework - A120 Horsley Cross - Parkeston Rbt Harwich Safety Impt · £28,022 · 28 Nov 2025
- PDF Framework - A27 Falmer Footbridge Headroom · £2,390 · 28 Nov 2025
- PDF Framework - RM1016 Holyport interchange · £11,909 · 28 Nov 2025
- PDF Framework - A5 EB WB M42 J10 - A5148 Wall SCRIM · £302,105 · 28 Nov 2025
- PDF Framework - A23 S Downs Way, Hickstead, Pyecombe Bundle - SDF Part 2 & 3 · £3,921,468 · 28 Nov 2025
- PDF Framework - A63 Brighton Street to Daltry Street Resurfacing · £555,028 · 28 Nov 2025
- PDF Framework - M6 J9 SB & NB Bescot Viaduct Pavement Hybrid Group 43 · £40,084 · 28 Nov 2025
- GI - BAM A38 signing · £43,972 · 28 Nov 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- JTP Improvement Programme · Suffolk Constabulary · £13,500
- S30119 Safety risk management continuous improvement · National Highways Limited · £72,976
- Strategic Advice for the Real Estate Vision Plan · Guy's and St Thomas' NHS Foundation Trust · £40,000
- Liverpool City Region Transport Model Update · Liverpool City Region Combined Authority · £1,200,000
- S30084 M60 Barton High Level Bridge - Bearing Adjustment - Cat 3 checks for the substructure AIP and GI survey reviews · National Highways Limited · £330,000
- S30128 Asset delivery asset maintenance (GM701) & inspection (GS801) update · National Highways Limited · £184,967
- S30113 IS055001 Auditing Services · National Highways Limited · £178,546
- S30102 Third Party NSIPs Technical Partner · National Highways Limited · £2,500,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.