Lighthouse Homeless Hub
key details
| Category (CPV) | 45000000 |
|---|---|
| OCID | ocds-kuma6s-141624 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| W F Clayton & Co Limited | · | · | · |
description
Refurbishment and alterations to Holyhead Enterprise Centre into the new Lighthouse Homeless Hub, along with the upgrading of the building fabric and mechanical and electrical installations to provide significant improvements in energy efficiency and maximising the EPC Rating. As well as a general internal refurbishment, alterations are needed to provide spaces suitable for purpose. The building fabric will be upgraded thermally by introduction of measures such as roof insulation, window / glazing replacement and external wall insulation.Adaptation and refurbishment of existing building and associated external work:Conversion of one wing of the building to form the new Homeless Hub.Refurbishment and alterations to the entrance and remaining wing which will be the new administration / office accommodation.Measures to improve the energy efficiency of the building, to include external wall insulation, replacement of windows and external doors, insulating at ceiling level.Installation of solar photo voltaic system.Minor external works include local alterations at new door positions, a new bin compound, provision of EV charging
documents
- Planning Permission
- ExistingSitePlan
- P1048-DYM-SAL-A1-ZZ-DR-A-0004_ExistingElevations
- P1048-DYM-SAL-A1-ZZ-DR-A-0007_ProposedElevations
- DYM-ENA-XX-XX-DR-S-0000 - Ceiling Inspection Hole General Arrangement P1
- DYM-ENA-XX-XX-DR-S-0001 - Structural General Arrangements (Sheet 1 of 2) P1
- DYM-ENA-XX-XX-DR-S-0002 - Structural General Arrangements (Sheet 2 of 2) P1
- DYM-ENA-XX-XX-DR-S-0003 - Standard Notation and Typical Details P1
- DYM-ENA-XX-XX-SC-S-0001
- 21231_DPL_XX_XX_RP_ME_0001_C01_RIBA_Stage_2_M&E_Services_Report
- 21231-DPL-XX-XX-RI-Y-0002
- Fee Schedule
- Technical Questionnaire
- Design Team Brief
- Form of Tender
- P1048-DYM-SAL-A1-00-DR-A-0001_LocationPlan
- P1048-DYM-SAL-A1-00-DR-A-0003_ExistingBuildingPlan
- P1048-DYM-SAL-A1-00-DR-A-0005_ProposedSitePlan
- P1048-DYM-SAL-A1-00-DR-A-0006_ProposedBuildingPlan
- LocationPlan
- 0002 - Structural General Arrangements Sheet 2
- 0003 - Standard Notation and Typical Details P1
- DYM-ENA-XX-XX-SC-S-0001
- 0001_C01_RIBA_Stage_2_M&E_Services_Report
- 21231-DPL-XX-XX-RI-Y-0002
- Conditional Planning
- Appendix 5 Fee Schedule
- Appendix 7 Outline Scope for Option 1
- Digartref Cyf Design Team Brief v.2 October 2023
- Form of Tender
- ExistingBuildingPlan
- Appendix 6 Technical Questionnaire
- ProposedSitePlan
- ProposedBuildingPlan
- ExistingSitePlan
- ExistingElevations
- ProposedElevations
- 0000 - Ceiling Inspection
- 0001 - Structural General Arrangements
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Fire Safety Remedial Works second contract · London Borough of Haringey · £12,500,000
- Contract Award Notice - Construction Works for Petroleum Storage Depot - RAF Akrotiri · Ministry of Defence · £14,000,000
- Haringey Partnering Contracts Lot 3 EAST (north) · London Borough of Haringey · £58,928,295
- Renewable Air Source Heat Pump Installations · Lincolnshire Housing Partnership Ltd · £3,000,000
- Haringey Partnering Contracts Lot 1 WEST · London Borough of Haringey · £51,677,266
- Leisure Management Joint Venture Partner · East Hampshire District Council · £33,665,212
- CWF Lot 2A - Potgill Holme Cattle Grid Replacement · WESTMORLAND AND FURNESS COUNCIL · £60,000
- Award of DGCP-0782 - 26EED004 - Annan Academy - Toilet Block Refurbishments · Dumfries and Galloway Council · £206,731
source
Published on Sell2Wales. Contact details for named individuals are not reproduced on this site.