CVL Transformation - Package 06A Permanent Way (Complex) - ITT
key details
| Value | £12,000,000 |
|---|---|
| Category (CPV) | 61 |
| Deadline | 6 May 2022 |
| OCID | ocds-kuma6s-120841 |
Awards (5)
This procurement was awarded to 4 suppliers. Values shown are per-award; the notice total is £12,000,000.
| Supplier | Value | Date | Status |
|---|---|---|---|
| Critical Rail Ltd shared | £3,000,000 | · | · |
| Enable Infrastructure Ltd shared | £3,000,000 | · | · |
| Mikerry Rail Limited shared | £3,000,000 | · | · |
| Ngage Resourcing shared | £3,000,000 | · | · |
| not named shared | · | 28 Apr 2022 | · |
description
Scopes:Civils construction elements included in the framework:- Level Boarding- Under Track Crossings- Installation of Station Tactiles- Earthworks schemes- Retaining wall schemes- Culvert construction- Track drainageCwmbach Station Level BoardingDrawings - Cwmbach StationSupplier to carry out their own takeoff to confirm actual works and quantities- Corus Style Section - contains but not limited to- Remove front steel angle- Remove Coper and Tactile- Clean off steel deck- Make steel work adjustments- Reinstall coper to new line and level- Install tactile- Adjust platform surface to suit- Reapply white/yellow lines- Supply spare materials (10%)- Block & Beam - contains but not limited to- Remove Cope and Tactile- Clean off surface- Reinstall coper to new line and level- Install tactile- Adjust platform surface to suit- Reapply white/yellow lines- Supply spare materials (10%)- Engineer provision- Setting out and gauge surveys- As-built production of level boarding- Quality control - BIM360 checklists and sign offWorking/access availability- Works to be planned to be carried out Midweek Nights based on 7hour possession times and a Saturday night Possession window of 8 hoursAdditional Information- Schedule of rates (produce list of competencies)- Mid week days- Mid week nights- Weekend days- Weekend nights- Bank Holidays- Welfare Van- Groundhog- List of all materials including rates- Cancellation notice period- Stand Down RatesAttendances- BB/AIW to supply Main Welfare Accommodation- BB/AIW will provide Possession Management Staff- BB to provide access to digital systems - supplier to provide hardware (iPAD)- Supplier to provide all site labour including COSS/SWL- Supplier to ensure that COSS/SWL are to have iPADs to use the digital epics system- Supplier to provide localised welfare as required- Supplier to provide all materials (inc water etc)- Supplier to provide all plant and tools (inc site lighting)Pentrebach Station Level boardingDrawing - Pentrebach LBSupplier to carry out their own take off to confirm actual works and quantities- Supplier to provide full details of Method and Risks- Standard platform construction - contains but not limited to- Remove Coper and Tactile- Clean off surface- Raise blockwork and over sail blocks- Install FP McMann Tactile and coper unit- Raise ironwork- Install edging kerbs to back of platform and around cabinets- Alter platform drainage- Install surfacing to suit new coper levels and falls as per design- Reapply white/yellow lines- Supply spare materials (10%)- Engineer provision- Setting out and gauge surveys- As-built production of level boarding- Quality control - BIM360 checklists and sign offWorking/access availability- Works to be planned to be carried out during a blockade, please can the supplier identify how long they require to complete these works.Additional Information- Schedule of rates (produce list of competencies)- Mid week days- Mid week nights- Weekend days- Weekend nights- Bank Holidays- Welfare Van- Groundhog- List of all materials including rates- Cancellation notice period- Stand Down RatesAttendances- BB/AIW to supply Main Welfare Accommodation- BB/AIW will provide Possession Management Staff- Supplier to provide all site labour including COSS/SWL- Supplier to ensure that COSS/SWL are to have digital tablets to use the digital epics system- Supplier to provide localised welfare as required- Supplier to provide all materials (inc water etc)- Supplier to provide all plant and tools (inc site lighting)Taffs Well UTXTaffs Well UTX Drawing - TRAN01-KAW-R0-R2P-DDR-C-CV-000114 - 26082020.pdfStandard UTX Construction- Procurement of UTX Materials- Installation of Up Main Chamber- Installation of 9.150m 4 way duct crossing- Installation of Down Main Chamber- Installation of hardstanding's and handrail- Handback Engineer following each shift in the Track Support Zone- All plant and materials to complete the works (excluding RRV's)- Track monitoring shift following construction- 7 Days following construction in the first week- 2 days in the second week- 2 days in the third week- 1 day in the fourth week- Temporary works supervisor provision- Engineer provision- Setting out of snake grid coordinates- As-built production of UTX- Quality control - BIM360 checklists and sign offAdditional Information- Schedule of rates (produce list of competencies)- Mid week days- Mid week nights- Weekend days- Weekend nights- Bank Holidays- Welfare Van- Groundhog- List of all materials including rates- Cancellation notice period- Stand Down RatesAttendances- RRV's will be provided by BB- Temporary works provided by BB- BB/AIW to supply Main Welfare Accommodation- BB/AIW will provide Possession Management Staff- Supplier to provide all site labour including COSS/SWL- Supplier to ensure that COSS/SWL are to have digital tablets to use the digital epics system- Supplier to provide localised welfare as required- Supplier to provide all materials (inc water etc)- Supplier to provide all plant and tools (inc site lighting)NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=120841.
Request for further information should be submitted through the Questions and Answers function on Sell2Wales. Please record your interest in the notice to submit a question.
Sub-contracting opportunities published on Sell2Wales are business-to-business transactions and are not subject to the normal public sector and EU rules regarding procurement. The Welsh Government does not accept responsibility or liability for the content, evaluation or award of sub-contracting opportunities.(WA Ref:120841)Relates to the following project/programme financed by EU Community Funds: More details available upon request.
more from Balfour Beatty Rail
- CVL Transformation - Package 06B Permanent Way (Non Complex) - ITT · £3,000,000 · 6 Feb 2024
- CVL Transformation - Package 03 Power Distribution, Switching and Commissioning - ITT · £50,000 · 17 Jul 2023
- · £699,508 · 1 Aug 2022
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- CVL Transformation - Package 06B Permanent Way (Non Complex) - ITT · Balfour Beatty Rail · £3,000,000
- CVL Transformation - Package 03 Power Distribution, Switching and Commissioning - ITT · Balfour Beatty Rail · £50,000
- CVL Transformation - Package 06B Permanent Way (Non Complex) - ITT · Balfour Beatty - Transport for Wales CVL Infrastructure Depot
- CVL Transformation - Package 07 Stations - ITT · Alun Griffiths Contractors
- CVL Transformation - Package 07 Stations - ITT · Alun Griffiths Contractors
- CVL Transformation - Package 07 Stations - ITT · Alun Griffiths Contractors
- CVL Transformation - Package 06A Permanent Way (Complex) - ITT · Balfour Beatty Rail Ltd · £1,500,000
- CVL Transformation - Package 07 Stations - ITT · Alun Griffiths Contractors