Callander Bridge RIBA Stage 3 Design Development
key details
| Value | £49,000 |
|---|---|
| Status | complete |
| Category (CPV) | 71322300 |
| Region | Scotland |
| Procedure | open |
| OCID | ocds-r6ebe6-0000827232 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Jacobs | · | · | · |
description
The contract is for the completion of RIBA Stage 3 for the new active travel bridge in Callander. This includes progressing the concept design developed in Stage 2, understanding ground conditions, initiating the planning application process, and providing a more accurate understanding of costs and risk before moving to detailed design.
documents
- Callander Bridge RIBA Stage 3 Design Development , awardNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
more from Stirling Council
- Google Workspace Renewal · £171,985 · 31 Aug 2026
- Supply and Delivery of Wheeled Bins and Containers · £100,000 · 28 Aug 2026
- Password Control Tool Renewal · £83,688 · 24 Aug 2026
- Forth Valley Meet the Real Buyer · 11 Aug 2026
- Software for Street Sweeping Routing Operations · £59,290 · 10 Aug 2026
- Stirling City Park Event Fields · £120,742 · 10 Aug 2026
- Gartner Services · £218,700 · 6 Aug 2026
- Stirling City Centre Vision · £87,500 · 3 Aug 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Support Services for Sculcoates Bridge Refurbishment Scheme, Kingston Upon Hull, Lot 1a, Direct Award · Hull City Council · £500,000
- Sutton Road Flyover Strengthening Scheme Development, Kingston Upon Hull, Lot 1a, Direct Award. · Hull City Council · £89,036
- ESC038/2025 - NEPO212 LOT 2 - Transporter Bridge Principle Designer · Middlesbrough Council · £768,271
- PCI_LotA_127 Blackwater Rail Strengthening · HAMPSHIRE COUNTY COUNCIL · £17,191
- PCI_LotA_117 Totton Bypass No 2 Cycleway provision · HAMPSHIRE COUNTY COUNCIL · £15,750
- Humber Bridge Barrier Safety Improvement Scheme · Hull City Council · £200,000
- North Bridge Level 2&3 Assessment · Hull City Council · £184,728
- Consultation Extras for Priory Drive Footbridge · Hull City Council · £28,862
source
Published on Public Contracts Scotland. Contact details for named individuals are not reproduced on this site.