gvtcx

SPS-11003 HMP Perth Boiler Upgrade

Scottish Prison Service Published 5 Mar 2026 Public Contracts Scotland

key details

Value£1,183,607
Statuscomplete
Category (CPV) 45331110 +12 more
RegionScotland
Procedureopen
OCIDocds-r6ebe6-0000813848

Award

SupplierValueDateStatus
James Ramsay (Glasgow) Ltd · · ·

description

The Main Energy Centre at HMP Perth has 4No 1200kW dual fuel (gas/oil) boilers which provide Medium Temperature Hot Water (MTHW) at 120/90C to all buildings on-site. The MTHW provides heating and hot water to each building via MTHW-LTHW plate heat exchangers. The Works shall include the design, installation, testing and commissioning of replacement dual fuel boilers of equivalent output together with associated burners, pipework, headers, pumps, pressurisation unit, flues, valves, gas and oil safety systems and controls installations. The works shall include the design and installation of a new central 24m high chimney stack/windshield with stainless steel flue liners, to replace the existing.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

more from Scottish Prison Service

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Public Contracts Scotland. Contact details for named individuals are not reproduced on this site.